Sign in

← Back to the document

Checklist - Adminstrative Subdivision with a Plat (PDF)

Document Date unknown · 2 page(s) in the original

This is the document's text, extracted automatically. Headings and paragraphs are inferred from the original's layout, so the arrangement may differ from the published version — the words do not. Where it matters legally, the original governs.

Original document ↗

§18:1-169 – ADMINISTRATIVE SUBDIVISION REVIEW CHECKLIST

File #: _______________________________ Zoning:

Critical Area Designation: Tax Map#:_________________ Grid#:________

Parcel#:____________________ Lot#:______________ Town:__________________________________

FOLLOW UP AT END OF REVIEW:

______ GIS department review ______ Application and/or plat have been signed by the owners of all existing lots affected by subdivision (cid:31)(cid:31)(cid:31)______ Once approved, 3 mylar’s, 7 paper copies & a CAD drawing on CD (if available) are required

DOCUMENTS:

______ Application has been completed accurately and is consistent with plat ______ All submitted information has been stamped and dated “received” ______ Correct application fee has been submitted ______ Project has been sent to Town if within 1 mile radius ______ Proof of notification to adjacent property owners and Fire/EMS Commission ______ A letter to the local VFD is not necessary unless a buildable lot is created

______ All agencies required to review project have been sent copies of the plan (necessary copies have been submitted) ______ Any property deed(s), right-of-way and/or other easement agreements have been submitted (questions on deed information should be discussed with the PC Attorney) ______ An APFO study or exemption not usually required, but check if part of larger project which might require it

______ GIS and Google map aerials

PLAT INFORMATION

______ Scale is legible and correct ______ Name and/or title of project ______ Name & address of registered surveyor, engineer, or professional responsible for preparing the plan ______ Seal of engineer/professional with signature & date ______ Ownership, zoning, & use of all adjacent properties ______ Purpose and Intent Statement ______ Revision block for all revisions and dates ______ Title block that contains Tax Map/Grid/Parcel/Lot, and Election District

______ North arrow is shown and the top of the plat shall be oriented north Page 1 of 2 Updated on 8:03:16 AM 6/27/2016 ______ Key map with north arrow showing property in relation to towns and State or County roads or intersections ______ Statement that any existing nonconformities have been addressed and no nonconformities are being created ______ This statement is on the plat: “After this plat is finally approved & recorded, any prior size or configuration of all

or any part of the land shown on this plat, or the prior status of any such land as a ‘lot’ under any zoning ordinance or subdivision regulations, is superseded by the size & configuration of the lots shown on the plat.”

LAND DESCRIPTION INFORMATION

______ Existing lots shown with broken lines and resulting lots shown by solid lines ______ Blow-up area of any metes/bounds descriptions that are very small for GIS department ______ Property boundary lines with metes, bounds, angles, bearings, dimensions, & curve data ______ Course & distance of lines to be removed with note, "line to be removed" ______ Gross area is given for existing & proposed lots

______ Area of resulting lot(s) calculated to nearest .01± square feet ______ Location & width of roads & rights-of-way which adjoin any resulting lot ______ Net buildable area calculation if needed ______ Critical area designation & location for existing & proposed lots (IDA, LDA, RCA, BEA) ______ Conservation Lands Map has been checked for MALPF and other easements or restrictions ______ MALPF Coordinator notified and any/all paperwork completed if a MALPF easement exists

______ Identify each resulting lot by consecutive numbers the same as by which existing lots were denoted ______ Location of proposed on-site well(s) & SRA(s), and, if possible, existing well(s) & SRA(s) ______ Areas to be dedicated or for public use are labeled & identified (“drainage easement”, utility easement”, “buffer yard easement”, etc.) on the plat ______ Front yard minimum setback shown on all resulting lots (more may be provided or altered as permitted*)

______ Side & rear yard minimum setbacks shown on all resulting lots (as noted above*) ______ Lot area and width are the minimum required ______ Road frontage is at least the minimum required REQUIRED CERTIFICATIONS (all required to be signed, typed name of signer & dated) ______ Owner's Certificate(s) ______Uniform Acknowledgement Act(s) (seal OK from notary) ______ Surveyor's Certificate ______Dept. of Environmental Health Certificate

______ Dept. of Public Works Certificate ______Planning & Zoning Department Certificate Page 2 of 2 Updated on 8:03:16 AM 6/27/2016

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.