This is a status update (presented April 4, 2024) on the Town of Centreville Wastewater Treatment Plant (WWTP) upgrade and expansion project. The project would upgrade treatment (enhanced nutrient removal) using a membrane bioreactor and expand capacity from 0.542 to 1.0 MGD; alternatives for treated effluent disposal (stream discharge, Corsica River, and spray irrigation/field) are being developed in parallel. Completed tasks include adoption into the County Comprehensive Water and Sewer Plan (expansion pending discharge), meetings with MDE and interest groups, and submission of a draft Preliminary Engineering Report (PER) to MDE; current work focuses on responding to MDE comments, finalizing the PER, effluent disposal planning, public outreach, and geotechnical and mixing studies. The presented schedule lists PER concluding June 2024, design June 2025, permitting December 2025, bidding March 2026, and construction concluding December 2029; funding sources listed include BRF (~$14.9M), CDS (~$2.15M), ARPA (~$2M), Rural Development ($500,000), loans TBD, and a total revenue stream/cost figure of $38,278,008.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

TOWN OF CENTREVILLE
WASTEWATER
TREATMENT PLANT
UPGRADE AND EXPANSION STATUS
APRIL 4, 2024

Topics
• Background
• Background
• Work Completed
• Work Completed
• Current Focus Areas
• Current Focus Areas
• Next Steps
• Next Steps
• Schedule
• Schedule
• Funding
• Funding

Background
• Upgrade Treatment
• Enhanced Nutrient Removal
• Membrane Bioreactor
• Expand from 0.542 to 1.0 MGD
• Alternatives for Treated
Effluent Disposal

Work Completed
• WWTP Upgrade has been approved and adopted into the
County’s Comprehensive Water and Sewer Plan (Expansion is
pending discharge)
• Met with MDE to discuss year-round stream discharge
• Met with Interest Groups to discuss the option for Corsica River
discharge
• Submitted Draft WWTP Preliminary Engineering Report to MDE

Focus Areas
• Received comments from MDE, finalize PER
• Develop Effluent Disposal Option as Parallel Task to
WWTP Project
• Continue Public Outreach

Next Steps
• Moving forward with Geotechnical Investigation
• Stream Discharge
• Mixing Study
• Investigate Construction Costs and Methods
• Spray Irrigation
• Continue to explore the availability and viability of a field
• PER final approval for the Final Design of the WWTP Project

Schedule
Finalize Final Construction
PER Design Permitting Bidding Construction
Concludes Concludes
June June December March December
2024 2025 2025 2026 2029
Develop Effluent
Disposal Option

Grants
a. BRF - ~$14.9M
(In Current Budget)
b. CDS - ~$2.15M
c. ARPA - ~$2M
d. Rural Dev. - $500,000
(Commerce)
Loans
a. TBD based on grant funding
Total Cost
Revenue Streams a. $38,278,008

DISCUSSION

THANK YOU!
WWW.TOWNOFCENTREVILLE.ORG

Variables
• Planning and Design
• Shift to modern filtering technologies (Membrane)
• Upgraded software
• Size/Capacity
• Allocation Fees for future improvements or expansion
• Support Town and County growth and planning efforts
• Discharge Options
• Spray Field and access infrastructure
• $12M+ for the field
• $1M per mile to reach the field (total miles/total cost)
• Direct Enhanced Stream Discharge (most viable and cost-effective)
• Extend past Watson Rd Bridge (cost)
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.