This record describes the Town of Centreville’s municipal sewerage system: it serves the whole town with about 1,976 building connections and an estimated 6,323 people. The treatment plant’s authorized capacity was increased over time (500,000 gpd → 542,000 gpd → amended to 1.0 mgd); average daily flow for 2018–2020 was 0.45 mgd (about 83% of permitted capacity) with 2020–2021 flows rising to 87% and 93% of the original authorized capacity. The upgraded plant uses a Membrane Bioreactor process that meets Enhanced Nutrient Removal and Reclaimed Water standards and can be further upgraded to Direct Potable Reuse; discharges include a surface water outfall to the Corsica River and a groundwater discharge via the Town’s water reuse facility. The Town will retain and operate its water reuse farm (Tax Map 45, Parcel 3) under state groundwater permits and plans to expand the storage lagoon from about 24 million to 60 million gallons; buffers and an expanded year-round direct discharge point are noted. Collection lines are mostly 8-inch gravity sewers with a grinder pump area for North Brook; the Town has reconstructed primary mains on Liberty and Commerce Streets and continues line replacement and inflow-and-infiltration remediation as funding allows, and plans system expansion tied to annexations. The sewer service map identifies an S-3 area at US Rt. 301 and MD Rt. 304 marked as a “Public Health Concern” for inadequate on‑site wastewater systems; service options for that area include Town service via a “Denied Access” line or a county-owned wastewater treatment plant.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

4.3.2 Municipal Systems
4.3.2.2 Centreville (Amended)
The incorporated community of Centreville has a sewerage system that serves the entire Town.
At present, there are approximately 1976 building connections serving an estimated 6323
people. The system was originally authorized an average daily flow of 500,000 gpd and was
later approved to increase the flow to 542,000. The current authorized flow is expanded to
1mgd as amended. The average daily flow for the years 2018, 2019, and 2020 averaged
0.45mgd/annual average daily flow or 83% of permitted capacity. A marked increase in 2020
and 2021 brought the flows to 87% and 93% of the original authorized capacity respectively.
The original treatment plant was designed to treat medium-strength domestic sewage with no
heavy organic loadings requiring special treatment. Discharges are a combination of a surface
water discharge into the Corsica River and a secondary groundwater discharge via the water
reuse facility.
The upgraded treatment facility now utilizes a Membrane Bioreactor method of treatment that
allows wastewater to be treated to meet and exceed current Enhanced Nutrient Removal (ENR)
standards as well as the Reclaimed Water standard. It is constructed to permit a seamless
upgrade with compatible additional treatment to Direct Potable Reuse standards. This
treatment plant lies within a state-designated Priority Funding Area (PFA).
The Town will maintain its existing water reuse farm (Tax Map 45, Parcel 3). This facility is
operated under State groundwater discharge permits which provide for year-round operations.
This facility includes a storage lagoon to be used to hold the treated effluent when needed. The
Town plans to expand the lagoon’s existing capacity from approximately 24 million gallons to 60
million gallons. The Town has provided adequate buffers for adjacent properties from spray
operations.
The Town maintains the existing approved point of direct discharge which has been expanded
for year-round use.
Most of the system’s collection lines are 8” gravity sewers. There are presently five (5) in the
system. Also, a grinder pump service area is currently serving the North Brook community. The
Town completed the full reconstruction of the primary collection mains in both Liberty and
Commerce Streets and continues to replace aging sewer lines and remediate inflow and
infiltration as revealed through a Town-wide study, as funds allow.

Ultimately, the Centreville sewerage system will expand to reach other developments as
annexations occur in accordance with the Town’s Comprehensive Land Use Plan. The Town
currently serves no properties beyond its corporate limits apart from limited service to the
county-owned White Marsh Park facilities.
The Centreville sewer service map shows an area designated as S-3 at the intersection of U.S.
Rt. 301 and MD Rt. 304 (now a full interchange). This is an area that has a mixture of
commercial, industrial, and municipal uses, all of which suffer from varying degrees of
inadequate on-site wastewater disposal systems. These areas carry the “Public Health
Concern” hatching. In addition, there are some parcels that are currently agricultural. These
parcels are designated on the Centreville Community Plan as “County Planned Business Park”
and on the Queen Annes County Comprehensive Plan – Economic Development & Tourism Map
BDT-1 as “County Business Park”.
Wastewater service would either be by the Town of Centreville, served by a “Denied Access”
line to keep intervening properties as No Planned Service, or by a county-owned and operated
wastewater treatment plant.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.