Upgrade Approach

A

Plan for phased build-out that considers engineering comprehensive and growth

B

planning dependencies.

Fiscal:

Finalize funding streams from Federal and State budget negotiations.

Alignment for phased funds over 2 or Engineering:

more state and/or federal budgets.

Move towards enhanced nutrient Source grant funding where removal treatment/filtering and applicable.

discharge technologies General Project Milestones Farm Purchase/Steam Planning Discharge and Design Invitations to Bid Construction Funding b d f h j a c e g i QAC Comp Water and Sewer MDE Contingent Draft RFP ROM 4-years Plan/Centreville Comp Plan Approvals Award to upgrade Partnerships and Alignment

COUNTY GROWTH PLANS CENTREVILLE ALIGNMENT

▪ 304/301 Interchange ▪ Upgrade WWTP to meet

both Town and County

▪ Infill Development

Growth and Comprehensive

▪ Business Park Development

Plans

▪ Mixed Commercial Use

▪ Denial of service line

▪ Department of Health -

extension.

failing septic system

▪ Sanitary Enclave

Variables

• Planning and Design

• Shift to modern filtering technologies (Membrane)

• Upgraded software

• Size/Capacity

• Allocation Fees for future improvements or expansion

• Support Town and County growth and planning efforts

• Discharge Options

• Spray Field and access infrastructure

• $12M+ for the field

• $1M per mile to reach the field (total miles/total cost)

• Direct Enhanced Stream Discharge (most viable and cost-effective)

• Extend past Watson Rd Bridge (cost)

Grants a. BRF - ~$14.9M (In Current Budget) b. COS - ~$2.15M c. ARPA - ~$2.5 - $3.3M (Spray Field) d. Rural Dev. - $500,000 (Commerce) Loans a. Loan $14.9M (possibly offset with an annual $5M state grant disbursed every year for the next 3 years) Revenue Streams Total Cost a. $38,278,008 WWTP Upgrade and Expansion

1. Average flows have exceeded 80% of permit capacity

• Some years exceeded 90%

2. Treatment performance challenging during high flows

3. Solids handling and disposal operations need to be upgraded

Current Configuration Water Treatment Well Aquifer Plant Households/ Businesses BNR Stream Wastewater Discharge Plant (Dec - Mar)

(0.542 MGD)

Spray Holding Field Pond (Apr - Nov) Upgrade and Expansion Plan Drinking Water Well Aquifer Treatment Plant Households/ Businesses Extended Stream

ENR - MBR

Discharge Wastewater

(0.458 – 1 MGD)

Plant (1 MGD) Increase (Year Round) Capacity & Modernize Existing Existing Spray Holding Field (0.542 MGD) Pond (Apr–Nov) Proposed WWTP Upgrade and Expansion

1. Liquid Treatment

a) Screening and Grit Removal

b) Flow Equalization

c) Activated Sludge MBR Process (ENR)

d) UV Disinfection

e) Effluent Pumping

2. Solids Treatment

a) Sludge Stabilization (Class B)

b) Dewatering/Storage

c) Land Application

Existing Stream Discharge Existing Stream Discharge

WWTP

Proposed Extended Stream Discharge Extended Stream Discharge Outfall Area

WWTP

DISCUSSION

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.