These are slides from a November 28, 2023 public hearing about the Town of Centreville Wastewater Treatment Plant Comprehensive Water and Sewer Plan upgrade. The presentation outlines a phased build-out approach tied to engineering and growth planning, lists project milestones (RFP, approvals, bid invitations, award, construction), and identifies partnerships with county growth plans and the Department of Health. It documents current capacity concerns (average flows over 80% of permit, some years >90%), the need to improve treatment performance at high flows and solids handling, and a proposed upgrade to year‑round enhanced nutrient removal using an MBR (ENR) process plus screening, grit removal, UV disinfection, and solids stabilization/dewatering. Funding needs and options are detailed: a total project cost of $38,278,008 with specific grants and loans noted (BRF ~$14.9M, COS ~$2.15M, ARPA ~$2.5–3.3M, Rural Development $500k, possible $14.9M loan with potential state grants), and discharge options compared (spray field with large costs vs. direct enhanced stream discharge described as most viable and cost‑effective).

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

TOWN OF CENTREVILLE
WASTEWATER
TREATMENT PLANT
COMPREHENSIVE WATER AND SEWER PLAN
UPGRADE DISCUSSION
NOVEMBER 28, 2023

Upgrade Approach
A
Plan for phased build-out that
considers engineering
comprehensive and growth
B
planning dependencies.
Fiscal:
Finalize funding streams from Federal
and State budget negotiations.
Alignment for phased funds over 2 or
Engineering:
more state and/or federal budgets.
Move towards enhanced nutrient Source grant funding where
removal treatment/filtering and applicable.
discharge technologies

General Project Milestones
Farm Purchase/Steam Planning
Discharge and Design Invitations to Bid Construction
Funding
b d f h j
a
c e g i
QAC Comp Water and Sewer MDE Contingent
Draft RFP
ROM 4-years
Plan/Centreville Comp Plan Approvals Award
to upgrade

Partnerships and Alignment
COUNTY GROWTH PLANS CENTREVILLE ALIGNMENT
▪ 304/301 Interchange ▪ Upgrade WWTP to meet
both Town and County
▪ Infill Development
Growth and Comprehensive
▪ Business Park Development
Plans
▪ Mixed Commercial Use
▪ Denial of service line
▪ Department of Health -
extension.
failing septic system
▪ Sanitary Enclave

Variables
• Planning and Design
• Shift to modern filtering technologies (Membrane)
• Upgraded software
• Size/Capacity
• Allocation Fees for future improvements or expansion
• Support Town and County growth and planning efforts
• Discharge Options
• Spray Field and access infrastructure
• $12M+ for the field
• $1M per mile to reach the field (total miles/total cost)
• Direct Enhanced Stream Discharge (most viable and cost-effective)
• Extend past Watson Rd Bridge (cost)

Grants
a. BRF - ~$14.9M
(In Current Budget)
b. COS - ~$2.15M
c. ARPA - ~$2.5 - $3.3M
(Spray Field)
d. Rural Dev. - $500,000
(Commerce)
Loans
a. Loan $14.9M
(possibly offset with an
annual $5M state grant disbursed every year
for the next 3 years)
Revenue Streams
Total Cost
a. $38,278,008

WWTP Upgrade and Expansion
1. Average flows have exceeded 80% of permit capacity
• Some years exceeded 90%
2. Treatment performance challenging during high flows
3. Solids handling and disposal operations need to be upgraded

Current Configuration
Water Treatment
Well Aquifer
Plant
Households/
Businesses
BNR Stream
Wastewater Discharge
Plant (Dec - Mar)
(0.542 MGD)
Spray
Holding
Field
Pond
(Apr - Nov)

Upgrade and Expansion Plan
Drinking Water Well Aquifer
Treatment Plant
Households/
Businesses
Extended Stream
ENR - MBR
Discharge
Wastewater
(0.458 – 1 MGD)
Plant (1 MGD)
Increase (Year Round)
Capacity
& Modernize
Existing Existing Spray
Holding Field (0.542 MGD)
Pond (Apr–Nov)

Proposed WWTP Upgrade and Expansion
1. Liquid Treatment
a) Screening and Grit Removal
b) Flow Equalization
c) Activated Sludge MBR Process (ENR)
d) UV Disinfection
e) Effluent Pumping
2. Solids Treatment
a) Sludge Stabilization (Class B)
b) Dewatering/Storage
c) Land Application

Existing Stream Discharge
Existing
Stream
Discharge
WWTP

Proposed Extended Stream Discharge
Extended
Stream
Discharge
Outfall Area
WWTP

DISCUSSION
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.