appendix_b.doc.pdf
Document Date unknown · 6 page(s)
Read as text View original PDF ↗
This document is the Maryland Department of the Environment (MDE) Water Quality Infrastructure Program Environmental Information Document (EID) form and instructions. It explains that applicants should use a Preliminary Environmental Screening Checklist to determine if their project qualifies for a categorical exclusion and that an EID must be completed when the project scope is well defined (after engineering report or schematic design). The form collects applicant and project identification, project description, list of engineering reports and permit status, and a detailed Part II checklist that prompts yes/no responses across categories including air quality, water quality, water supply, biology, wetlands, sensitive areas, floodplain, sludge management, historical/archaeological sites, land use, community amenities, and public participation. Part III asks for mitigation plans and how identified impacts will be addressed, and the cover provides MDE contact and submission instructions (Water Management Administration, Water Quality Infrastructure Program, 1800 Washington Boulevard, Baltimore MD).
Show the raw extracted text
Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.
07.06 MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 (410) 537-3000 1-800-633-6101 http://www.mde.state.md.us WATER QUALITY INFRASTRUCTURE PROGRAM ENVIRONMENTAL INFORMATION DOCUMENT Instructions: The Preliminary Environmental Screening Checklist (PESC) may be used as a guide in determining if the proposed project qualifies for a Categorical Exclusion from a detailed environmental review. If the project does not qualify for a Categorical Exclusion, an Environmental Information Document (EID) must be completed by the applicant. The EID should be completed upon completion of the engineering report or schematic design, when the project scope is well defined to determine environmental consequences. Completed EID should be forwarded to the Maryland Department of Environment, Water Management Administration, Water Quality Infrastructure Program, 1800 Washington Boulevard, Baltimore, Maryland 21230. Attention: Project Management. Part I - General Information Applicant: Project Name: MDE Project #: Project Location: County: Person Completing EID - Name/Title: Phone #: Fax #: 1. Provide a brief description of the proposed project including individual components, unit processes, system capacity, sizing, discharge point, etc. (Attach map/system layout or reference document - i.e., engineering/schematic design report, if not previously provided): 2. Describe the purpose/need for the project, and summarize the water quality/public health problems being corrected: 3. Has the project previously been subjected to an environmental review by another federal/state agency? Yes/No If Yes, describe the outcome of that action: 4. List the title and date of all engineering reports, design plans etc. used as sources of information (Attach, if not previously provided): MDE/WMA-FIN004 Page 1 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper 07.06 5. Provide a list and status of all applicable permits or approvals required for the proposed project: Permit Reference/Number Status Part II - Environmental Review In completing Part II, please check appropriate box (for a Yes response) in identifying potential environmental impacts of the proposed project. 1. Air Quality [] Will their be a possible violation of ambient air quality standards as a primary impact of the project? [] Will the project involve incineration or composting? [] Will the project involve boiler or emission/odor control equipment? [] Is significant development planned or expected, which could yield a possible violation of ambient air quality standards as a secondary impact of the project? [] Will their be possible violation of noise standards as a primary or secondary impact of the project? Comments:_______________________________________________________________________________________________________________ 2. Water Quality [] Will the project involve a new or relocation of groundwater or surface discharge point? [] Are local sedimentation and erosion controls insufficient? (i.e. the county/municipality lacks enforcement authority for sedimentation and erosion controls). [] Will the project involve stream crossings? Comments:_______________________________________________________________________________________________________________ 3. Water Supply [] Is there an existing public water supply intake downstream of the proposed discharge? [] Will the proposed discharge adversely affect recreational areas? [] Will the project cause a significant amount of water to be transferred from one sub-basin to another? [] Will the project have significant adverse effect on groundwater? (leachate from sludge disposal, land disposal or on-site disposal etc.) [] Will the existing or future development, because of this project, affect the quality or quantity of groundwater? Comments:_______________________________________________________________________________________________________________ 4. Biology [] Are there endangered or threatened species within the project service areas? [] Will wildlife or their habitat be affected by the project location or future development? [] Will aquatic life will be affected by the proposed project? (i.e., discharge located adjacent to a shellfish waters). Comments:_______________________________________________________________________________________________________________ 5. Wetlands [] Will the proposed project directly impact tidal or non-tidal wetlands? [] Will wetlands in the service area be affected indirectly (development/other land use) by the proposed project? Comments:_______________________________________________________________________________________________________________ 6. Sensitive Areas MDE/WMA-FIN004 Page 2 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper 07.06 [] Will the proposed project affect any rivers designated as wild or scenic? [] Is the project inconsistent with Critical Area requirements? [] Will coastal barriers or zones be affected by the project or subsequent development? [] Does the proposed project involve steep slopes? [] Will the proposed project affect wilderness areas? Comments:_______________________________________________________________________________________________________________ 7. Floodplain [] Will the proposed project adversely affect the floodplain? [] Will the project design fail to meet the floodproofing requirements. Comments:_______________________________________________________________________________________________________________ 8. Sludge Management [] Will the project increase the amount of sludge generated? [] Does the applicant have an inadequate sludge management/disposal system? Comments:_______________________________________________________________________________________________________________ 9. Historical/Archaeological Sites [] Do any registered historic sites exists in the service area? [] Will the project affect any known or potential archaeological sites? Comments:_______________________________________________________________________________________________________________ 10. Land Use Planning and Reserve Capacity [] Will existing vacant land be subject to increased development pressure due to the proposed project? [] Will the project cause significant changes in residential, industrial, commercial or agricultural land use? [] Is the project designed to serve future growth/new development? [] Will the proposed project affect the demand or availability of energy sources? [] Will the proposed project overload drinking water or sewerage facilities? Comments:_______________________________________________________________________________________________________________ 11. Community Amenities [] Is there an inadequate buffer zone between the proposed project and existing residential areas? [] Will the proposed project cause adverse effects on any park, recreational, or open space? [] Will the proposed project require land acquisition, rights-of-way, or relocation of residential/business properties? Comments:_______________________________________________________________________________________________________________ MDE/WMA-FIN004 Page 3 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper 07.06 12. Public Participation [] Does the proposed project have significant public controversy? Comments:_______________________________________________________________________________________________________________ Please indicate the extent of public involvement in the proposed project: Dates Community Public Meetings/Hearings ________________________________ Council/Committee Meetings ________________________________ Other Meetings ________________________________ MDE/WMA-FIN004 Page 4 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper 07.06 PART III - Review Summary For Items/Boxes checked in Part II above, outline below how the environmental impacts identified will be addressed: Item #/Environmental Short Term/Long Controllable/ Mitigative Measures being I mpact Term Impact Unavoidable Undertaken/Necessary __________________________________________________ __________________________ Signature of Applicant’s Representative Date _____________________________________________________________________________________________________________________________ Name and Title ****************************************************************************************************************************** FOR MDE USE Additional Information Needed: YES/NO Date Requested _____________ Date Received ______________ Comments: ______________________________________________________________________________________________________________ Review Summary: Has compliance with Federal Cross-cutters been demonstrated? YES _________ NO ___________ N/A _____________ Has compliance with State Growth Consistency been demonstrated? YES _________ NO ___________ N/A _____________ (Review/Attach copy of PESC) Beneficial Impacts:____________________________________________________________________________________________________ _______________________________________________________________________________________________________________________ Possible environmental permits that the applicant did not identify:____________________________________________________ (Please advise applicant) _______________________________________________________________________________________________________________________ Possible adverse impacts/mitigative measures necessary that the applicant did not identify:____________________________ (Please advise applicant) _______________________________________________________________________________________________________________________ Recommendation: MDE/WMA-FIN004 Page 5 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper 07.06 FONSI ___________ EIS ___________ Project Engineer: __________________________________________________ Date: _____________________________ Division Chief: ____________________________________________________ Date: _____________________________ MDE/WMA-FIN004 Page 6 of 6 August 27, 1998 TTY Users 1-800-735-2258 Recycled Paper