Sign in

← All documents

Stormwater Utility Feasibility Study Phase I (2010)

Document Date unknown · 123 page(s)

Text not extracted yet. This document is in the record, but its text hasn't been read out of the file — it's most likely a scan awaiting OCR. That means it won't appear in search results and the assistant can't quote or cite it. Use the original PDF below.

Read as text View original PDF ↗

This document is the Phase I Stormwater Utility Feasibility Study prepared for the Centreville Town Council and dated October 18, 2010. The cover lists consulting office locations at 5400 Limestone Road, Wilmington, DE 19808 and 4051 Ogletown Road, Newark, DE 19713, and notes financial assistance from the Coastal Zone Management Act administered by the Office of Ocean and Coastal Resource Management, NOAA.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

SSTTOORRMMWWAATTEERR UUTTIILLIITTYY
FFEEAASSIIBBIILLIITTYY SSTTUUDDYY
CCeennttrreevviillllee TToowwnn CCoouunncciill
110011 LLaawwyyeerrss RRooww
CCeennttrreevviillllee,, MMaarryyllaanndd 2211661177
October 18, 2010
5400 Limestone Road 4051 Ogletown Road
Wilmington, DE 19808 Newark, DE 19713
Financial assistance provided by the Coastal Zone Management Act of 1972, as amended, administered by the
Office of Ocean and Coastal Resource Management, National Oceanic and Atmospheric Administration.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.