This June 10, 2020 memorandum from the Director of Public Works to the Centreville Town Council outlines work done and a proposed timeline and purchases to implement MDE and McCrone recommendations for the North Brook Water Treatment Plant (WTP). It notes COVID-19 and Well 5 being offline have limited staff scheduling, summarizes implemented steps (hiring McCrone, raw well sampling, filter media testing that found North Brook media stripped and replacement media ordered, consultations on SOPs and backwash rates, daily arsenic testing, a move to semiannual and uni-directional flushing, and water tower inspections on June 3). The memo schedules backwash drawdown tests the week of June 15 and requests Council approval for specific purchases: two Quick Arsenic Scan units ($2,000 each, $4,000 total), one-time and ongoing lab sampling for June ($1,309 for June; lab line overbudget by $17,147), an inline turbidity meter and chart recorder ($4,772.10) with installation billed in FY21, and VFDs for backwash pumps to limit recycle flow ($4,559.13) with FY21 invoicing. The supplemental Purchase Request document will be forwarded to MDE and McCrone after Council approval, and Request #5 asks to arrange a public workshop with MDE and McCrone via Facebook/Zoom or live for questions and comments.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

The Town of Centreville 101 Lawyers Row Centreville, MD 21617
410-758-1180 fax 410-758-4741 www.townofcentreville.org
MEMORANDUM
June 10, 2020
TO: Town Council of Centreville
FR: Kip Matthews, Director of Public Works
RE: Proposed Timeline for Implementation of North Brook Recommendations from MDE
and McCrone
Due to COVID-19 and Well 5 Water Treatment Plant (WTP) continuing to remain off line, staff
is limited to what they are able to schedule and do at this time. The following outline is what has
been done and a rough schedule of what recommended actions can be taken with the Council’s
approval.
Recommendations already implemented to date:
1. Before January 20, 2020, Town hired a consultant (McCrone Engineering) to make
recommendations on optimizing Water Treatment Plant (WTP) performance and address
issues in the distribution system that may be causing the discolored water. The
investigation needed to include water chemistry and hydraulics such as water hammer.
2. Filter media from the WTPs were sampled and sent to the filter manufacturer and
analyzed. The Comet Drive WTP filter media was in good condition in regards to size,
uniformity, and hardness. The filter media from the North Brook WTP showed
significant stripping and rebedding the filter was suggested. Filter media for the North
Brook WTP was ordered and delivered. These filters will be scheduled for the week after
the Comet Drive WTP is back in service.
3. The raw well water was sampled from both wells and analyzed with the results used by
McCrone to consult with Hungerford and Terry, the filter manufacturer.
4. McCrone has consulted with Hungerford and Terry for Standard Operating Procedures
(SOP), design capacities, raw water and backwash flow rates and to determine the need
for muriatic acid injected before the filters.
5. McCrone has evaluated the backwash loading rates and they are acceptable for the
designed filters. To quantify this information and assist to refine the filter operation,
Town staff will perform backwash draw down tests, with timed sampling, the week of
June 15, 2020. It has been recommended by MDE and McCrone to install a continuous in
line turbidity meter and chart recorder. When this is approved by Council, it will be
ordered and installed promptly. Please see Purchase Request #3 on the following
supplemental document.
Page | 1

6. Arsenic was tested at the WTPs and reported on the Monthly Operating Reports (MOR)
three times a week. They are now tested every day and reported on the MORs.
7. The Point of Entry (POE) Arsenic testing used by Town staff is a color comparison
method. MDE and McCrone both recommend using a more accurate method. When this
purchase is approved by Council, it will be ordered and placed in service as soon as it
arrives. Please see Purchase Request #1 on the following supplemental document.
8. An annual flushing of the distribution system in October or November has been in place
for many years. A semiannual program has been started as of April 2020 and will be
completed in North Brook once the Comet Drive WTP is back in service. This will
include an uni-directional flushing program as recommended.
9. All three of the Town water towers were inspected on June 3rd and the reports will arrive
in the next two weeks.
This document and a supplemental document Purchase Request per MDE and McCrone
Recommendations will be forwarded to MDE and McCrone for discussion after Council has
reviewed and authorized the purchases.
Page | 2

North Brook Water Treatment Plant Performance Evaluation
Purchase Request Per MDE & McCrone Recommendations
as of May 27, 2020
Per the Maryland Department of the Environment’s (MDE) Performance Evaluation and
McCrone Engineering Inc. recommendations, staff is requesting the following
purchases/expenditures at this time.
Request #1
MDE Recommended Plan of Action. Page 3 “Operation”
“The equipment used to measure arsenic in-house is a color comparison method with a
minimum reporting limit of 4ppb. This type of test can be subjective. Using a more
accurate test to measure arsenic with a lower minimum reporting limit should be
considered.”
McCrone Summary and Prioritization of Recommended Actions.
“Supplemental Recommendation for Treatment Optimization” Page 11
Section 2b
Purchase the “Quick Arsenic Scan Unit”
The in-house arsenic test used daily is a color comparison method which is currently
visually compared between the sample and a chart. This scan unit reads the color and
takes out any human error. This is the only bench top unit that will read as low as 5.0
ppb. Staff would require one for each Water Treatment Plant (WTP).
Quick Scan Arsenic #481305 @ $2000,00 each / one for each WTP total $4,000.00
This purchase would be coded to C24-6220 Small Tools and Equipment. This line item currently
has $1,670.81 left and would leave a deficit of $2,329.19.
Request #2
MDE Recommended Plan of Action. Page 3 “Operation: First Bullet Point
“The MORs reflect arsenic monitoring at point of entry 2-3 times per month. While daily
iron and chlorine samples are being taken at the plant, arsenic should also be monitored
and recorded daily in light of the elevated arsenic results to identify and track patterns of
any breakthrough that occurs. Regular distribution monitoring should also be performed
and recorded.”
McCrone Summary and Prioritization of Recommended Actions.
Recommended Action #1 Page 4 of 11 “Perform Additional Testing”
Section 2 a, d
This step will require a one time, 8 samples at $77.00 each.
Recommended Action #3 Page 6 of 11
Closely Monitor Finished Water
This step will require 4 samples June 2020 at $77.00 each.
Supplemental Recommendation for Treatment Optimization. Page 11 of 11
Section 3
This step will require 5 samples per month at $77.00 each.
The total cost of these samples for June 2020 would be $1,309.00.
Page | 3

Lab fees are coded to C24-7440 Contract Services. Due to budget cuts over past years, and
MDE’s requirement to bring a consultant (McCrone) on board, this line item is currently over
budget by $17,147.00.
Request #3
MDE Recommended Plan of Action. Page 3 “Design”: Second Bullet Point
“Having a continuous inline turbidity or iron analyzer after the filters may wish to be
considered for gathering data of when and how often iron breakthrough occurs. This can
provide a better understanding of what is coming out of the plant and assist in identifying
any patterns.”
McCrone Summary and Prioritization of Recommended Actions.
Recommended Action #1 Page 10 of 11
Install Turbidity Meter and Chart Recorder at the WTP.
The cost of this equipment is $4,772.10.
Labor will be time and materials by HIE, the Town’s in-line metering equipment contractor.
With the lag time of ordering parts and scheduling, these invoices will be billed in FY21.
Request #4
MDE Recommended Plan of Action. Page 3 “Design”: First Bullet Point
“The plant recycles its backwash water all at one time in a batch process that possibly
overloads the filters at times with extremely high concentrations of “recycled” iron and
arsenic. A variable frequency drive should be considered to lower the recycle flow and
enter the plant at a steady state without a water hammer. An engineer should be consulted
for this.”
McCrone Summary and Prioritization of Recommended Actions.
Recommendation #4. Page 8 of 11
“Evaluate and Select a Permanent Solution to the Solids in the Recycled Backwash
Water”
Permanent Option #2
Install Variable Frequency Drives (VFDs) on the backwash pumps in order to reduce the
flow rate from the backwash recycle pumps to no more than 10% (50 GPM) of the filter
inlet flow. Limiting to 10% of the raw water flow is a current best practice.
Cost of equipment and installation $4,559.13.
This purchase would be invoiced in FY21.
Request #5
Arrange a workshop meeting in the near future to include MDE staff, McCrone staff, and the
public, via Facebook/Zoom or live for questions and comments.
Page | 4
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.