This is a set of landscape and construction plan sheets (progress set, November 2015) for the Centreville Wharf property prepared for the Town Council of Centreville. The packet includes sheet L-1 through L-9 with a callout and materials plan, multiple detail plans (plaza, picnic area, paving, stairs, walls), boardwalk railing and ramp/stair modifications, and a preliminary pavilion column-base design. Sheet L-9 lists site furnishings and quantities (e.g., 8 benches, 6 picnic tables, 3 charcoal grills, 2 curved benches) and identifies manufacturers, models, colors, and mounting types. The plans show the project location as Centreville Wharf, Third Election District, Queen Anne’s County, Maryland (Tax Map 35H, Grid 12, Parcel 1303, Lots 1 & 2).

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
1-L
gwd.nalPslairetaM1-L\DAC\frahWellivertneC\stcejorP\:Z
MA54:20:016102,02yraunaJ,yadsendeW
CALLOUT&MATERIALSPLAN
L-1 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
2-L
gwd.snalPliateD2-L\DAC\frahWellivertneC\stcejorP\:Z
MA42:10:116102,81yraunaJ,yadnoM
1 PLAZADETAILPLAN
L-2 18"=1'-0"
2 TYPICALPICNICAREAPLAN 3 FILLBEHINDEXISTINGBOARDWALK
L-2 316"=1'-0" L-2 NOTTOSCALE
DETAILPLANS
L-2 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
3-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 COLOREDCIPCONCRETEPAVING 2 BRICKPAVINGWITHCONCRETEBAND 3 FLEXIBLEPOROUSPAVING
L-3 NTS L-3 NTS L-3 NTS
4 BRASSPLAQUEINPAVING
L-3 NTS
DETAILS-PAVING
L-3 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
4-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 CIPCONCRETESTAIR 2 CIPCONCRETESTAIR-CROSS-SECTION
L-4 1"=1'-0" L-4 1"=1'-0"
3 STONEVENEERWALL 4 STONEVENEERPIER 5 HANDRAILA(FORCONCRETESTAIR)
L-4 1"=1'-0" L-4 1"=1'-0" L-4 112"=1'-0"
DETAILS-STAIRANDWALLS
L-4
2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
5-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 BOARDWALKRAILINGMODIFICATION-ADDALTERNATEA
L-5 18"=1'-0"
2 EXISTINGRAMPRAILINGMODIFICATION 3 BOARDWALKRAILINGMODIFCATION-ADDALTERNATEB
L-5 18"=1'-0" L-5 18"=1'-0"
DETAILS-EXISTINGBOARDWALK
L-5 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS DETAILS-BOARDWALKRAMPANDSTAIRS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
6-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 LONGSTAIRTOBOARDWALK 2 SHORTSTAIRTOBOARDWALK
L-6 1"=1'-0" L-6 1"=1'-0"
3 PROPOSEDRAMPANDSTAIRS-TYPICALCROSS-SECTION 4 GUARDRAILANDHANDRAILB(ONBOARDWALK,RAMP,ANDSTAIRS)
L-6 1"=1'-0" L-6 112"=1'-0"
L-6 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
7-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 BOARDWALKSTAIRANDRAMP-DETAILPLAN
L-7 38"=1'-0"
2 BOARDWALKRAMP
L-7 34"=1'-0"
DETAILS-BOARDWALKLAYOUTANDRAMP
L-7 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
8-L
gwd.sliateD8-3-L\DAC\frahWellivertneC\stcejorP\:Z
MA44:20:116102,81yraunaJ,yadnoM
1 PAVILIONLAYOUTPLAN 2 PAVILIONCOLUMNBASEDESIGN-PRELIMINARY(NOTFORCONSTRUCTION)
L-5 34"=1'-0" L-5 34"=1'-0"
DETAILS-PAVILION
L-8 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
9-L
gwd.sgnihsinruFetiS9-L\DAC\frahWellivertneC\stcejorP\:Z
MP31:01:45102,11rebmeceD,yadirF
BENCH:
QTY:(8)BENCHES
PICNICTABLE:
MANUFACTURER:VICTORSTANLEY
QTY:(6)TABLES
CONTACT:VICTORSTANLEY
MANUFACTURER:VICTORSTANLEY
CONTACT:VICTORSTANLEY CHARCOALGRILL: P.O.DRAWER330 CURVEDBENCH:
DUNKIRK,MD20754USA
P.O.DRAWER330 QTY:(3)GRILLS QTY:(2)BENCHES
301-855-8300
DUNKIRK,MD20754USA MANUFACTURER:ULINE MANUFACTURER:VICTORSTANLEY
MODEL:RB-28TOMATCHEXISTING
301-855-8300 CONTACT:ULINENYCPHILA CONTACT:VICTORSTANLEY
VICTORSTANLEYBENCH
MODEL:PT-28'(6'WITH2 400BOULDERDRIVE P.O.DRAWER330
ONSITE-CONTRACTORTO
EXTENSIONS) BREINIGSVILLE,PA18031 DUNKIRK,MD20754USA
COLOR:TITANIUM 1-800-295-5510 VERIFYEXISTINGBENCH 301-855-8300
MODELCONFIGURATION
MOUNT:SURFACEMOUNT MODEL:H-4419 MODEL:FRB-26'
COLOR:TITANIUM
MOUNT:IN-GROUND COLOR:TITANIUM
MOUNT:GROUNDMOUNTINTO
MOUNT:IN-GROUND
CONCRETESUBBASE
ARMRESTS:NONE
1 PICNICTABLE 2 GRILL 3 BENCH 4 CURVEDBENCH
L-9 NOTTOSCALE L-9 NOTTOSCALE L-9 NOTTOSCALE L-9 NOTTOSCALE
BOARDWALKLIGHT:
PATHWAYLIGHT: QTY:(15)LIGHTS
QTY:(21)LIGHTS MANUFACTURER:LUMEC
MANUFACTURER:LUMEC CONTACT:WARRENSPARKES
CONTACT:WARRENSPARKES AMBIANCELIGHTING
AMBIANCELIGHTING 5303CHRYSLERWAY BIKERACK:
5303CHRYSLERWAY SUITE101 QTY:(1)RACK
SUITE101 UPPERMARLBORO,MD MANUFACTURER:VICTORSTANLEY
UPPERMARLBORO,MD 888-777-5117 CONTACT:VICTORSTANLEY
888-777-5117 MODEL:CANDELASERIES P.O.DRAWER330
MODEL:CANDELASERIES CANDB1-H15 DUNKIRK,MD20754USA
CANDB1-H15 HEIGHT:15" 301-855-8300
FINISH:NP(NaturalAluminum) FINISH:NP(NaturalAluminum) MODEL:BRCS107
MOUNT:IN-GROUND MOUNT:MOUNTINGPLATE COLOR:TITANIUM
PROVIDEOPTIONDR:120vPOWER PROVIDEOPTIONDR:120vPOWER MOUNT:IN-GROUND
RECEPTACLE RECEPTACLE
5 PATHWAYBOLLARDLIGHT 6 BOARDWALKLIGHT 7 BIKERACK
L-9 NOTTOSCALE L-9 NOTTOSCALE L-9 NOTTOSCALE
POLELIGHT:
QTY:(3)LIGHTS
MANUFACTURER:LUMEC
CONTACT:WARRENSPARKES
AMBIANCELIGHTING
PAVILION: 5303CHRYSLERWAY
QTY:(3)PAVILIONS SUITE101
MANUFACTURER:CLASSIC UPPERMARLBORO,MD
RECREATIONSYSTEMS STEELSITESTRASHRECEPTACLE: 888-777-5117
CONTACT:BRIANLEWIS TBD QTY:(4)RECEPTACLES MODEL:CANDELASERIES
CUNNINGHAMREC. MANUFACTURER:VICTORSTANLEY CAND1
P.O.BOX487 CONTACT:VICTORSTANLEY CN1-1A
QUEENSTOWN,MD21658 P.O.DRAWER330 AM6
800-233-0529 DUNKIRK,MD20754USA HEIGHT:15'
MODEL:ASPEN16'X16' 301-855-8300 FINISH:NP(NaturalAluminum)
MODEL:A-36 MOUNT:IN-GROUND
SEESHEETL-8 COLOR:TITANIUM PROVIDEOPTIONS:
FORINSTALLATION MOUNT:IN-GROUND DR:120vPOWERRECEPTACLE
BA:BANNERARM
HS:HOUSESHIELD
8 PICNICPAVILION 9 PERFORMANCEPAVILION 10 TRASHRECEPTACLES 11 POLELIGHT
L-9 NOTTOSCALE L-9 NOTTOSCALE L-9 NOTTOSCALE L-9 NOTTOSCALE
SITEFURNISHINGS
L-9 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
01-L
gwd.nalPgnitnalP21-01-L\DAC\frahWellivertneC\stcejorP\:Z
MA95:92:016102,02yraunaJ,yadsendeW
CANOPYTREES
QTY KEY BOTANICALCOMMONNAME SIZE SPACING ROOT REMARKS
10 A Acerrubrum'OctoberGlory' 212"-3"cal. Asshown B&B Full
OctoberGloryRedMaple
2 L Liquidambarstyraciflua'Rotundiloba' 2-212"cal. Asshown B&B
AmericanSweetgum
6 P Platanusoccidentalis'Bloodgood' 212"-3"cal. Asshown B&B Full
SycamoreTree
5 Q1 Quercusalba 212"-3"cal. Asshown B&B
WhiteOak
3 Q2 Quercusphellos 2-212"cal. Asshown B&B
WillowOak
4 U Ulmusamericana'Princeton' 212"-3"cal. Asshown B&B
AmericanElm
ORNAMENTALTREES
QTY KEY BOTANICALCOMMONNAME SIZE SPACING ROOT REMARKS
2 Cc Cerciscanadensis'ForestPansy' 10'Ht. Asshown B&B Multistem
ForestPansyEasternRedbud
8 Li Lagerstroemiaindica'Biloxi' 10'Ht. Asshown B&B Multistem
BiloxiCrapeMyrtle(PalePink)
3 Sa Sassafrasalbidum 7'Ht. Asshown B&B
Sassafras
SHRUBS
QTY KEY BOTANICALCOMMONNAME SIZE SPACING ROOT REMARKS
116 bm Buxusmicrophyllavar.japonica'GreenBeauty' 18"Ht. 3'o.c. B&B
GreenBeautyBoxwood
36 is Ilexglabra'Shamrock' 24-30"Ht. 4'o.c. B&B
ShamrockInkberry
154 iv Iteavirginica'Henry'sGarnet' 18"Ht. 4'o.c. B&B
VirginiaSweetspire
34 ra Rhusaromatica'gro-low' 24"Ht. 4'o.c. cont.
SweetSumac
8 vt Viburnumtrilobum
AmericanCranberry
PERENNIALS
QTY KEY BOTANICALCOMMONNAME SIZE SPACING ROOT
1140 lsd Liriopespicata'SilverDragon' 2qt. 12"o.c. cont.
SilverDragonLilyturf
294 nep Nepeta'Walker'sLow' 1Gal. 15"o.c. cont. REMARKS
Catmint
236 phr Penstemondigitalis'HuskerRed' 1gal. 12"o.c. cont.
HuskerRedPenstemon
GRASSES
QTY KEY BOTANICALCOMMONNAME SIZE SPACING ROOT
117 pas Panicumvirgatum'Shenandoah' 2gal. 30"o.c. cont.
Switchgrass
MEADOWMIX ErnstSeedMix
XercesMid-AtlanticPollinatorMix-XERC00102
PLANTINGPLAN-PARK
L-10 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
11-L
gwd.nalPgnitnalP21-01-L\DAC\frahWellivertneC\stcejorP\:Z
MA95:92:016102,02yraunaJ,yadsendeW
TOPSOILNOTES AASHTO T 90, AASHTO T 267 and shall meet the following specified B. Submitthesourcelocationsofalltopsoiltobeused.
requirements:
C. Submit a list of all chemicals and herbicides applied to the topsoil for
thelastfiveyearsandalistofanyplantsgrowninthetopsoil.
PART1: GENERAL
1. GradingAnalysis:
C. The Contractor shall not transport topsoil to the site without the proper
SieveDesignation MinimumMass(Weight) testing, certifications, and acceptance by the Engineer. Topsoil
1.1 DESCRIPTION
StandardAlternate PercentPassing transported to the site without prior approval shall not be accepted for
A. Topsoil shall consist of furnishing and placing topsoil for lawn, shrub
inches placement and be disposed of by the contractor at their expense. All
beds, planters, and tree pits. Topsoil shall be a rich, friable material
conformingwiththerequirementsofthesespecifications. 2 2In. 100 testing and certifications shall be the sole responsibility of the
contractor.
0.2 No.4 90
B. Topsoilshallbeplacedatadepthof12inchesinallunpavedareasand
feathered to the final grade lines. Topsoil shall be placed in conformity 0.08 No.10 80
withtherequirementsofthesespecifications. PART3: EXECUTION
C. On site material is not suitable for use as topsoil. All topsoil must be Minimum Maximum A. Placing. Before placing or depositing topsoil upon any section as
shown on the plans, the foundation upon which the topsoil is to be
obtained from a pre-approved off-site location. Topsoil shall be placed Percent Percent
placedshallbeapproved.
so that the grade shown on the plans is the final grade of soil at 85 Passing0.08in.(No.10)
compaction. B. Ripallsub-soilareastoreceivetopsoiltoadepthof (cid:25)(cid:16)(cid:27)(cid:180)priortotopsoil
andretained
placement.
on0.003in.(No.200)
1.2 RELATEDDOCUMENTS sieve C. Topsoil shall be installed in six inch lifts. Each lift shall be compacted
to85percent. Thefinalelevationof thetopsoilshallbebasedonan85
Sand: 30 40
A. Drawingsandgeneralprovisionsof theContract,includingGeneraland percent compaction rate and shall correspond to elevations shown on
SupplementaryConditionsapplytoworkofthissection. Passing0.003in. theplans.
(No.200)sieve
D. Maintaining the Topsoil. The contractor shall maintain the topsoil at
Silt: 40 60 hisher own expense until final completion and acceptance of the
Clay: 5 20 contract. Maintenanceshallconsistofpreserving,protecting,replacing,
1.3 RELATEDSECTIONS
and such other work as may be necessary to keep the topsoil in a
A. PlantingNotesandSpecifications 2. ChemicalAnalysis: satisfactory condition which shall be defined as not allowing erosion or
compactiontotakeplace.
a. Organicmattershallconsistofapprovedorganicmaterial
andshallmakeupnotlessthan3normorethan8oftopsoil. E. FinalCleaning. Uponthecompletionof thissection,finalcleaningshall
PART2: PRODUCTS
b. pHbetween5.5and6.0. be done within the limits of the project, and shall consist of completely
cleaning the project of excess material, sweeping pavements and
c. Solublesaltlessthan0.9millimhocm
2.1 DESCRIPTION structures of dirt and rubbish, and the removal of any unused material
d. CationExchangeCapacity(CEC)15orgreater
A. Topsoilshall be friable loam topsoilof uniform quality, free fromgravel, whichwillmar theappearanceof thecontractorrepairinganyareasas
stones, and other materials retained on a 50 mm (cid:11)(cid:21)(cid:180)(cid:12) sieve. Topsoil e. CarbonNitrogenRatiolessthan33:1. determinedbytheEngineerasnotmeetingthespecifications.
shall have no heavy clay, frozen clods, lumps, plants, roots, sticks, f. Magnesium-Mg 125-265lbsacre
asphalt,concrete,orforeignmaterialsharmfultoplantgrowth. Phosphorus-P2O5 103-205lbsacre
B. Topsoil shall be reasonably free of noxious perennial weeds or wood Potassium-K2O 161-320lbsacre
vegetationsandcompletelyvoidofJohnsongrass(Sorghumhalapense) Calcium-Ca 861-1720lbsacre
as determined through prior inspection by an authorized representative Solublesalts Nottoexceed900ppm
oftheDepartment.
Thefollowingelementsshallnotexceedtheindicatedamount:
Boron 3lbsacre
2.2 TESTING Manganese 50lbsacre
A. Atleast 30days prior toorderingmaterials, theContractor shallsubmit Potassium 450lbsacre
to the Engineer or the Engineer's representative certified tests and
Sodium 20lbsacre
records for materials specified herein including topsoil sources. No
g. Toxicelementsandcompoundsshallbebelowamaximum
materials shall be ordered until the required test results and records
levelasrecommendedbytheapprovedsoiltestingfacilityforthe
have been reviewed and approved by the Engineer or the Engineer's
plantsbeinggrown.
representative. Delivered materials shall match the approvedsamples.
h. Porespace,35-50percent.
Approval shall not constitute final acceptance. The Engineer reserves
the right to reject, on or after delivery, any material that does not meet
thesespecifications. 2.3 APPROVEDPRODUCTS
B. Threesoilsamplesshallbetakenfromeachstockoftopsoiltobeused. A. The area or areas from which topsoil is secured shall possess such
Soil samples shall be submitted to a public agricultural extension uniformity of material depth, color, texture, drainage, and other
service agency or other testing facility capable of all testing required characteristics as to offer assurance that when removed in commercial
under thesespecifications (SeebelowSection2.2.B)andapprovedby quantities, the product will be homogeneous in nature and will conform
the Engineer. The testing laboratory for physical analysis shall have a totherequirementsofthesespecifications.
minimum of five years experience with the test protocols of the USGA.
Test results shall be sent directly from the testing facility to the 2.4 SUBMITTALS
Engineer.
A. Submit a soil test from a soil testing laboratory as noted under 2.2 of
C. The method of testing topsoil shall be in accordance with the thesespecifications.
requirements of AASHTO T 88, Modified; AASHTO T 89, Method B;
PLANTINGPLAN-BIOSWALES
L-11 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
21-L
gwd.nalPgnitnalP21-01-L\DAC\frahWellivertneC\stcejorP\:Z
MA95:92:016102,02yraunaJ,yadsendeW
1 TREEPLANTINGDETAIL 2 SHRUBPLANTINGDETAIL 3 PERENNIALPLANTINGDETAIL
L-12 NOTTOSCALE L-12 NOTTOSCALE L-12 NOTTOSCALE
PLANTINGNOTES UNFORESEENORUNSUITABLEPLANTINGCONDITIONSARISE,SUCHAS SOIL.USENITROGEN-FORTIFIEDORGANICMATERIALORSPREADTWO
FAULTYSOILDRAINAGE,CHEMICALRESIDUESORINCONSISTENCIES POUNDSOFAMMONIUMSULFATEPER100SQUAREFEET.OVERTHISLAYER
PLANTIDENTIFICATION-ALLPLANTSSHALLBEPROPERLYMARKEDFOR BETWEENPLANSANDACTUALSITECONDITIONS,THEYSHOULDBECALLED SPREADATHINLAYEROFFERTILIZERPERTHESCHEDULEUNLESSTHE
IDENTIFICATIONANDCHECKING. TOTHEATTENTIONOFODGANDTHEOWNERFORADJUSTMENTBEFORE SOILTESTINDICATESOTHERWISE.ROTOTILFERTILIZERANDORGANIC
PLANTING.PLANTSSHALLBESETPLUMBANDSTRAIGHTANDTREESSHALL MATTER,MIXINGTHEMTHOROUGHLYINTOTHESOIL.USEATILLERTHAT
LISTOFPLANTMATERIAL -THEQUANTITIESGIVENINTHEPLANTLISTARE BEGUYEDORSTAKED,WHEREREQUIRED,ATTHETIMEOFPLANTING. WILLCULTIVATETOAMINIMUMDEPTHOF8"ANDDONOTMAKEMORETHAN
APPROXIMATEONLY.THECONTRACTORWILLVERIFYPLANTQUANTITIES BACKFILLSHALLBEWELLWORKEDABOUTTHEROOTSANDSEATEDBY TWOPASSES.THEENTIREBEDMAYBECULTIVATEDWITHASPADEIF
PRIORTOBIDDINGANDANYDISCREPANCIESSHALLBEBROUGHTTOTHE WATERING.PLANTSWILLBEPLANTEDHIGHERTHANSURROUNDINGGRADE. PREFERRED.WHENFINISHED,RAKESURFACEWITHASTEEL-TOOTHRAKE
ATTENTIONOFTHELANDSCAPEARCHITECT.THECONTRACTORSHALL SHRUBSANDTREESWILLBESETATADEPTHTOPLACE18THOFTHE UNTILSMOOTH.MOISTENTHEBED,LETTHEWATERSOAKIN,ANDRAKEIT
FURNISH,ANDPLANT,ALLPLANTSREQUIREDTOCOMPLETETHEWORKAS ROOTBALLABOVEFINISHGRADE.REMOVEROPEFROMROUNDTREE AGAIN.
SHOWNONTHEDRAWINGS.SUBSTITUTIONSSHALLNOTBEMADEWITHOUT TRUNKSANDLAYBACKBURLAPANDWIREBASKETSFROMTOP13OFALL
THEWRITTENAPPROVALOFOASISDESIGNGROUPANDTHEOWNER. THIS B&BMATERIAL.NYLON,PLASTIC,ORVINYLROPEANDORBURLAPWILLBE ANNUALFLOWERBEDPREPARATION -ASOILTESTSHALLBETAKENFOR
CONTRACTWILLBEBASEDONTHEBIDDERHAVINGVERIFIEDPRIORTO COMPLETELYREMOVEDFROMALLPLANTMATERIALPRIORTOPLANTING. PHANALYSISANDTHESOILAMENDEDWITHGROUNDLIMESTONEFOR
BIDDINGTHEAVAILABILITYOFTHEREQUIREDPLANTMATERIALSAS ACIDICSOILANDGARDENSULFURORFERROUSSULFATETOALKALINESOIL
SPECIFIEDONTHEPLANTMATERIALSLIST. CULTIVATION-ALLTRENCHESANDSHRUBBEDSSHALLBECULTIVATED, ATRATESRECOMMENDEDBYTHESOILTEST.THEFINALPHSHOULDBE
EDGEDANDMULCHEDTOADEPTHOF2"MINIMUMAND3"MAXIMUMWITH BETWEEN6.5AND6.8.SOILSHALLBESPADEDTOADEPTHOF
PLANTQUALITY-ALLSHRUBSSHALLBEDENSE,HEAVYTOTHEGROUND, WELL-AGED,FINE-SHREDDEDHARDWOODBARK.THEAREAAROUND APPROXIMATELY12".SPREAD2"-3"OFORGANICMATERIALOVERSOIL
ANDWELLGROWN,SHOWINGEVIDENCEOFHAVINGBEENPRUNED ISOLATEDPLANTSSHALLBEMULCHEDTOATLEASTA6"GREATER ORGANICMATERIALMAYBECOARSEMOISTPEATMOSS,WELL-ROTTED
REGULARLY,ANDSHALLBEVIGOROUS,HEALTHYANDOFGOODCOLOR. DIAMETERTHANTHATOFTHEHOLE. MANUREORCOMPOST.OVERTHISLAYEROFORGANICMATERIAL,SPREAD
ALLPLANTSSHALLBESOUND,FREEOFPLANTDISEASE,INFESTATION,OR ATHINLAYEROFFERTILIZERPERTHESCHEDULEABOVE.ROTOTIL
INSECTEGGSANDSHALLHAVEAHEALTHY,NORMALROOTSYSTEM. FERTILIZER&INOCULATION -ALLFERTILIZERSHALLBEGRANULAR,WITH35 FERTILIZERANDORGANICMATERIALTOADEPTHOF6",MIXINGTHEM
PLANTSSHALLBEFRESHLYDUGANDNOTHEELED-INSTOCK,NORSTOCK TO80PERCENTOFTHETOTALNITROGENINASLOWLYAVAILABLEFORM. THOROUGHLYINTOTHESOILANDCONTINUETOBREAK-UPLUMPS;THEN
FROMCOLDSTORAGE.ALLPLANTSSHALLBENURSERYGROWN.PLANTS FORTREES,SHRUBS,ANDGROUNDCOVER;FERTILIZERSHALLBEA RAKESURFACEWITHSTEEL-TOOTHRAKEUNTILSMOOTH.MOISTENTHE
SHALLNOTBEPRUNEDPRIORTODELIVERY.THESHAPEOFTHEPLANT COMPLETEFERTILIZERWITHAMINIMUMANALYSISOF10PERCENT BED,LETTHEWATERSOAKINANDRAKEITAGAIN.SPACEPLANTSAS
SHALL,INGENERAL,CONFORMTOITS NATURALGROWTHPROPORTIONS NITROGEN,6PERCENTPHOSPHORUSAND4PERCENTPOTASSIUM.FOR INDICATEDONDRAWING.
UNLESSOTHERWISESPECIFIED.ALLPLANTS,INCLUDINGCONTAINER PERENNIALS,ANNUALS,ANDBULBS;FERTILIZERSHALLBEA
GROWN,SHALLCONFORMTOTHEBRANCHING,CALIPERANDHEIGHT TIME-RELEASED,HIGH-PHOSPHATEFERTILIZER;I.E.,OSMACOTE.FOR GUARANTEEANDREPLACEMENT -ALLPLANTMATERIALSHALLBE
SPECIFICATIONSOFTHEAMERICANASSOCIATIONOFNURSERYMEN'S BULBS,FERTILIZERSHALLBEBONEMEAL(COMMERCIAL,RAWAND UNCONDITIONALLYGUARANTEEDFORONEYEAR.THEGUARANTEEWILL
PUBLICATIONENTITLED AMERICANSTANDARDFORNURSERYSTOCK, FINELY-GROUND),WITHANANALYSISOF4PERCENTNITROGENAND20 BEGINONTHEDATEOFFINALACCEPTANCEOFTHEWORK.AFTERAPLANT
LATESTEDITION,ANDSHALLHAVEAWELL-SHAPED,HEAVY-BRANCHED PERCENTPHOSPHORICACID. HASBEENDETERMINEDTOBEDEAD,DYINGORDAMAGEDFROMHANDLING
STRUCTUREFORTHESPECIES.EVERGREENTREESARETOHAVEAN ORINSTALLATION,ITWILLBEREPLACEDDURINGTHENEXTGROWING
INTERNODENOGREATERTHAN24"ANDSHALLBEUNIFORMLY FERTILIZERSHALLBEADDED DEPENDINGONTHESIZEOFTHEPLANTAND SEASON.FOREXAMPLE,IFAPLANTISFOUNDDEADDURINGTHESUMMER
WELL-SHAPED.PLANTSOFAGIVENSIZESHALLNOTMEASURELESSTHAN THEMANUFACTURER'SRECOMMENDATIONUSINGTHEFOLLOWING MONTHS,ITWILLBEREPLACEDDURINGTHEFALLPLANTINGSEASON.THE
THEMINIMUMSIZEASSETFORTHINTHE AMERICANSTANDARDFOR APPLICATIONRATES: GUARANTEEWILLENDFORALLPLANTMATERIALONEYEARAFTER
NURSERYSTOCK, LATESTEDITION. 1. TREES:USE2LB.OF10-6-4FERTILIZERPERINCHOFTRUNKDIAMETER. ACCEPTANCE.DURINGTHEGUARANTEEPERIOD,THECONTRACTORWILL
2. SHRUBS:USE14LB.OF10-6-4FERTILIZERPERFOOTOFHEIGHTOR NOTBERESPONSIBLEFORMECHANICALINJURYORVANDALISMCAUSEDBY
PLANTSPACING-PLANTSPACINGISTOSCALEONPLAN. SPREADPERPLANT,OR3-5LBSOF10-6-4FERTILIZERPER100SQUARE OTHERPARTIES.
FEETOFBEDAREA.
SOILMIX-SOILMIXWILLBE23EXISTINGTOPSOIL,13LEAFMOLD 3. GROUNDCOVER:USE3LBS.OF10-6-4FERTILIZERPER100SQUAREFEET MATERIALINSPECTION-OWNERANDORODGSHALL,ATTHEIR
THOROUGHLYMIXEDANDHOMOGENIZED.OTHERORGANICMATERIALMAY OFBEDAREA. DISCRETION,INSPECTPLANTMATERIALBEFOREANDDURINGDELIVERY
BESUBSTITUTEDUPONWRITTENAPPROVALBYODG. 4. PERENNIALS,ANNUALS,BULBS:USE3LBS,OFTIME-RELEASE, ANDINSTALLATION.PLANTMATERIALWILLBEPROPERLYDELIVEREDIN
HIGH-PHOSPHATEFERTILIZER(5-10-5)PER100SQUAREFEETOFBED COVEREDTRUCKS,ANDPROMPTLYUNCOVEREDWHENDELIVEREDTO
ROOTBALLSIZE-THEBALLSIZESHALLCONFORMTOTHEAMERICAN AREA. PREVENTDAMAGE.MATERIALWILLBEUNLOADEDANDPROPERLYHANDLED
ASSOCIATIONOFNURSERYMEN'SPUBLICATIONENTITLED AMERICAN 5. PLANTINGPITSSHALLBEBACKFILLEDWITHAMIXTURECONTAINING80 INSUCHAWAYASNOTTODAMAGEPLANTS.PLANTSWILLBEINSPECTED
STANDARDFORNURSERYSTOCK, LATESTEDITION,ANDSHALLBE EXISTINGTOPSOIL,20ORGANICMATERIALSUCHASLEAFMOLD,PEAT ANDMAYBEREJECTEDUPONDELIVERYANDORINSTALLATIONBYTHE
WRAPPEDINUNTREATEDBURLAP. MOSSORCOMPOSEDSEWAGESLUDGE.INCORPORATEENDO-AND OWNERFORMECHANICALDAMAGE,ANDDAMAGETHATWILL
ECTOMYCORRIHIZALFUNGITRANSPLANTAMENDMENTPER SUBSEQUENTLYCAUSEMISSHAPENORDEFORMEDMATERIAL.OWNERWILL
EXCAVATION-HOLESFORALLTREESSHALLBE2TIMESTHESIZEOFROOT MANUFACTURER'SRECOMMENDATIONS(MANUFACTURER: HAVEAUTHORITYTOOBSERVESITEPREPARATIONANDPLANTING
BALLORCONTAINERANDSHALLHAVEVERTICALSIDES.HOLESFOR HORTICULTURALALLIANCE,INC.PHONE1-800-628-6373). INSTALLATIONS,ANDHAVETHERIGHTTOREJECTANYWORKIFTHE
4 EVERGREENPLANTINGDETAIL
(cid:54)(cid:43)(cid:53)(cid:56)(cid:37)(cid:54)(cid:3)(cid:54)(cid:43)(cid:36)(cid:47)(cid:47)(cid:3)(cid:37)(cid:40)(cid:3)(cid:20)(cid:21)(cid:180)(cid:3)(cid:58)(cid:44)(cid:39)(cid:40)(cid:53)(cid:3)(cid:55)(cid:43)(cid:36)(cid:49)(cid:3)(cid:55)(cid:43)(cid:40)(cid:3)(cid:53)(cid:50)(cid:50)(cid:55)(cid:3)(cid:37)(cid:36)(cid:47)(cid:47)(cid:17)(cid:3)(cid:3)(cid:37)(cid:40)(cid:39)(cid:54)(cid:3)(cid:41)(cid:50)(cid:53)(cid:3)(cid:48)(cid:36)(cid:54)(cid:54) SPECIFICATIONSANDCONSTRUCTIONDOCUMENTSARENOTFOLLOWED.
PLANTINGSHALLBEENTIRELYROTOTILLEDTOADEPTHOF8"ANDSHALL GROUNDCOVERBEDPREPARATION -ALLAREASOFGROUNDCOVERSHALL ALLPLANTMATERIALSHALLBEOFTHEQUALITYSPECIFIEDANDINSTALLED
L-12 NOTTOSCALE
BE18"BEYONDTHEAVERAGEOUTSIDEEDGEOFPLANTBALLS.ORGANIC BEROTOTILLEDTOADEPTHOF6".APPLY2"OFORGANICMATERIAL ASDESCRIBEDABOVE,ANDUNLESSTHESEMINIMUMSTANDARDSARE
MATERIAL(LEAFMOLD)WILLBEINCORPORATEDINTOPLANTBEDSBY (LEAFMOLD)ANDROTOTILLUNTILTHOROUGHLYMIXED.APPLYFERTILIZER SATISFIED,THEPLANTSWILLBEREJECTED.
TILLINGAGAINTOADEPTHOF8".PROPORTIONSOFSOILTOORGANIC ASSTATEDABOVE.
MATERIALWILLBETWOPARTSEXISTINGSOILTOONEPARTORGANIC
MATERIAL. PERENNIALFLOWERBEDPREPARATION -ASOILTESTSHALLBETAKEN
FORPHANALYSISANDTHESOILAMENDEDWITHGROUNDLIMESTONEFOR
PLANTING-BACKFILLINGSHALLBEDONEWITHSOILMIXPREVIOUSLY ACIDICSOILANDGARDENSULFURORFERROUSSULFATEFORALKALINE
DESCRIBED,REASONABLYFREEOFSTONES,SUBSOIL,CLAY,LUMPS, SOILATRATESRECOMMENDEDBYTHESOILTEST.THEFINALPHSHOULD
STUMPS,ROOTS,WEEDS,BERMUDAGRASS,LITTER,TOXICSUBSTANCES, BEBETWEEN6.5AND7.0.SOILSHALLBESPADEDTOADEPTHOF12".
ORANYOTHERMATERIALWHICHMAYBEHARMFULTOPLANTGROWTHOR SPREAD4"OFCOMPLETELYDECAYEDORGANICMATERIAL(LEAFMOLD,
HINDERGRADING,PLANTING,ORMAINTENANCEOPERATIONS.SHOULDANY WELL-ROTTEDMANUREATLEASTONEYEAROLD,ORCOMPOST)OVERTHE
PLANTINGDETAILSANDSPECIFICATIONS
L-12 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
31-L
gwd.snalPretsaM41-31-L\DAC\frahWellivertneC\stcejorP\:Z
MA55:92:016102,02yraunaJ,yadsendeW
1 PLAZAMASTERPLAN
L-13 18"=1'-0"
MASTERPLAN-PLAZA
L-13 2 12.11.2015 95PROGRESSSET
01.20.2015

DATE:
REVISIONS SHEETNO.:
JOBNUMBER:
REV. DATE DESCRIPTION
1 11.06.2015 65PROGRESSSET SCALE:
DRAWNBY:
DESIGNEDBY:
APPROVEDBY:
SEAL FILENO.:
FOLDERREFERENCE: DATE
esehttahtyfitrecyberehI.noitacifitreClanoisseforP
dna,emybdevorpparoderaperperewstnemucod
desnecilyludamaItaht
esneciL,dnalyraMfoetatSehtfoswalehtrednu
.____________:etaDnoitaripxE,____________.oN
NOVEMBER2015
ONTHELANDSOF:
ASSHOWN CENTREVILLEWHARF
MAGJG
THIRDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MARYLAND
SSMAG
TAXMAP35H,GRID12,PARCEL1303,LOTS1&2
SS
PREPAREDFOR:THETOWNCOUNCILOFCENTREVILLE
41-L
gwd.snalPretsaM41-31-L\DAC\frahWellivertneC\stcejorP\:Z
MA55:92:016102,02yraunaJ,yadsendeW
1 MASTERPLAN-WHARFENVIRONS
L-14 1"=50'
MASTERPLAN-WHARFENVIRONS
L-14 2 12.11.2015 95PROGRESSSET
01.20.2015
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.