Sign in

← All documents

Community Plan PowerPoint Presentation

Document Date unknown · 16 page(s)

Read as text View original PDF ↗

This is a workshop PowerPoint for the Centreville Planning Commission describing a proposed update to the Town’s Comprehensive Plan (the 2009 plan is being refined, not fundamentally changed) and noting the update meets new State standards. The update centers on five goals: directing expansion of municipal water and sewer, strengthening the local economy and commercial tax base, organizing the character and function of streets and adjacent development, connecting neighborhoods with open spaces/greenways/trails, and guiding the location and character of future neighborhoods. The presentation details wastewater treatment conditions and a recommendation to modernize and expand the Centreville WWTP: the plant is permitted to discharge an average of 542,000 gpd (only Dec 1–Mar 31), recorded a 2021 average flow of 506,000 gpd (about 93% of permitted capacity, leaving ~36,000 gpd capacity or roughly 144 houses), and expansion options range from ~542,000 gpd up to 1.25 million gpd (the 1.25M gpd option would be needed to serve planned growth through 2040); an additional spray irrigation field would also be required and any expansion depends on funding. The plan also shows household and population projections (households 1,850 in 2020 to 2,560 in 2040, +710; population 4,715 to 6,670, +1,955), proposed 2040 land-use changes (natural area protection, expanded CBD along Water St./Penn Ave., infill tracts as PUDs, institutional areas retained), growth-area changes (new County Business Park, added employment zone on MD 213, expanded greenways, reduced mixed-use corridor length, employment at US 13/MD 213 interchange), and transportation/greenway proposals (East Side Parkway, making some state highways parkways, more interconnecting local roads, and an expanded trail network). The presentation ends with a community vision question asking residents to imagine what future generations would find most impressive about today’s planning choices.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

WORKSHOP – Centreville Planning Commission
Comprehensive Plan Update
•
Required once every 10 years.
•
The current plan --Centreville Community Plan was adopted in 2009.
•
This proposed update does not change the 2009 Plan in major ways.
•
It refines the 2009 Plan and major ideas intact.
•
It focusses on five refined goals.
•
And it meets new State standards for comprehensive plans.

5 Big Goals
1
Provide direction on how to expand the municipal water and sewer
for the Plan
system
Update
Develop the local economy, the commercial tax base, and ensure the
2
strong and resilient fiscal health of our local government.
Organize the character and function of the Town’s existing and future
3
streets and the development that will front them.
Interconnect existing and future neighborhoods with outstanding open
4
spaces and greenways that will impart a character of good health, small
town vitality, and scenic beauty.
Guide the location, layout, and character of future
5
neighborhoods

Provide direction on
how to expand the
municipal water and
sewer system

Conditions
The WWTP is permitted to discharge an average of 542,000 gpd of treated
domestic wastewater, but only between December 1 and March 31.
The WWTP discharges to Gravel Run which the MDE classifies as a “Use 1 Waterway
The MDE permits the Town to operate a spray irrigation system for effluent disposal year-round,
which the Town is required to do, in combination with discharge to Gravel Run, to provide this
essential service.
The WWTP recorded an average daily flow of 506,000 gpd in 2021, which is well above
the three-year average noted above, and represents 93% of permitted capacity, leaving
a remaining capacity of 36,000 gpd – about enough to serve 144 more houses.

Recommendation:
Upgrade and Expand Wastewater Treatment Capacity
Modernize and Expand the Centreville wastewater treatment plant (WWTP) and its
effluent discharge capacity.
The decision to expand will depend on the availability of funding. Options include
replacing the plant at about its same capacity of 542,000 gpd to 750,000 gpd, 1 million
gpd, or 1.25 million gpd.
A capacity of 1.25 million gpd would be necessary to serve the Town planned residential
and employment growth through 2040.
Another spray irrigation field will be needed too.

Interconnect existing and future
neighborhoods with outstanding
open spaces and greenways that
will impart a character of good
health, small town vitality, and
scenic beauty.

Develop the local economy, commercial
tax base, and ensure the strong and
resilient fiscal health

Complete
Neighborhoods
• A variety of housing types
• Neighborhood level commercial uses
• Parks, Greenways, Trails
• Institutional uses
• Walkable
• Interconnected with open spaces
• Interconnected with streets
• Clustering and land preservation
• Planned for Sustainability

Household Projections: 2020 - 2040
4500
4000 Growth
3500
3000
Projection
2
Projection 3
2500
2000 Projection 1
1500
1000
500
0
2000 2010 2020 2030 2040
Households: 2020: 1,850 2040: 2,560 Change: +710
Population: 2020: 4,715 2040: 6,670 Change: +1,955

Changes
LAND USE 2040
Designates Natural Areas for Open
A.
Space Protection
Expands the CBD along Water St.
B.
to Little Hut Dr. and along Penn.
Ave.
C. Calls for the Infill Tracts to be Planned
Unit Developments (PUDs)
D.
Institutional Areas to remain
Institutional

Changes
GROWTH AREA
A.
Adds the planned County
Business Park and land
south of Taylor Mill Road
Expands natural areas and
B.
designate greenways
C. Add an Employment
Zone on MD 213,
opposite Laser Drive
D. Reduces the length of
“Mixed Use Corridor”
E. Employment Uses at the
U.S. Route 13 / MD Route
213 Interchange

Changes
STREETS PLAN
A.
East Side Parkway
B.
State Highways to be parkways
C.
Primary Local Roads to improve
interconnections

Greenway and Trail Plan
EXPANDED TRAIL NETWORK
Trails
Existing Trail
Programmed for
Construction
Planned
Greenways
Changes
Greenway are designated in
Growth Area and In-Town
Trail network is expanded

Vision Question
Imagine you are in a future generation of Centreville
Town residents (not yet born): What would impress you
most about the vision of today’s citizen planners?
Suggested Way to frame your answer:
“I would be most impressed that they ………………!”
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.