2022-10-05_pc_minutes.pdf
Document Date unknown · 17 page(s)
Read as text View original PDF ↗
This is the Centreville Planning Commission public workshop minutes from October 5, 2022, where the town planner presented a PowerPoint overview of the draft Comprehensive Plan (attached to the record). Discussion focused heavily on municipal water and sewer: the WWTP is permitted for 542,000 gpd discharge (only Dec 1–Mar 31), recorded a 2021 average flow of 506,000 gpd (93% of permitted capacity) leaving ~36,000 gpd capacity (about 144 houses), and the Plan recommends modernizing/expanding the plant with options from ~542,000 gpd up to 1.25 million gpd and adding another spray irrigation field. The Commission discussed growth-area rules and annexation (property owners can petition for annexation; Rt. 213 & 301 is not currently in the growth area but could be considered), with public comments requesting Coursevall Drive be extended, urging inclusion of Tidewater Direct property to support industrial/commercial uses near the overpass, calling for explicit zoning for healthcare facilities to attract them, and noting gaps in sidewalks/walkability. Council President Kline reported two new council members (Jim Beauchamp and Dan Worth) and ongoing council work on the Growth Allocation for the Carter Farm; the workshop adjourned at 9:10 p.m.
Show the raw extracted text
Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.
Centreville Planning Commission Public Work Shop October 5, 2022 7:00 p.m. MINUTES The October 5, 2022 Centreville Planning Commission public work shop was called to order at 7:00 p.m. by Kara Voight, Chair; in the Liberty Building, second floor meeting room. The following members and staff were present: Kara Voight, Chair; Mitchell Delaney, Secretary; Pat Fox and Nancy Emerick, Members; Steven K. Kline, Town Council President; Charles M. Koogle, Town Manager; Chris Jakubiak, Town Planner; and Betty Jean Hall, Administrative Assistant. Citizen Comment No citizens provided comments. Discussion a. Draft Comprehensive Plan – Chris Jakubiak, Town Planner • Mr. Jakubiak displayed a power point presentation overview of the draft Comprehensive Plan to the attendees which is attached to these minutes so that it becomes part of the official record. • Providing direction on how to expand the municipal water and sewer system. o Mr. Koogle stated increasing the capacity to 1.25 million gallons per day (gpd) would be too much for the biology of the wastewater treatment plant to work at this point. There would not be enough waste going into the plant to balance the water. o Mr. Kline stated the discharge of treated domestic wastewater is only between December 1 and March 31 because the increase of algae blooms is more likely in warmer weather months. The spray field irrigation farm is used to discharge wastewater in the remaining eight months of the year. • Growth Area o Mr. Jakubiak stated a property owner within the designated growth area would have the right to petition the Town to be annexed. The Town retains the ability to accept or deny the petition. If annexed, a property can benefit from Town zoning and Town water and sewer services. o The area at the intersection of Rt. 213 & 301 is not in the designated growth area however, the inclusion of this area on the growth map signals that the Town is open to the possibility that there might be a development proposal or use that would be in the interest of the citizens of Centreville and if so, the Town would consider amending the growth boundary to incorporate that area. • Mr. Joe Brown, Concerto Avenue, stated he would like to see Coursevall Drive extended back to the area where the YMCA is being constructed. • John Foster, Tidewater Direct, stated extending the growth area to include all the Tidewater Direct property would increase the commercial base because the uses that will provide jobs and amenities that people want to see in this Town like manufacturing or distribution type uses will want to be near the overpass. It would not be intrusive to the rest of the Town. It is easier for large trucks to exit and enter off Rt. 301. There is already an existing industrial user in this area, should they want to expand it would be very expensive without water and sewer. How would they install sprinkler systems to a new building without installing an above ground water tank. • Mr. Kline stated a property not currently annexed is required to pay for its capacity expansion at the wastewater treatment plant. • Ms. Voight stated there is a definite need for healthcare in Town and surrounding areas. The Planning Commission should review the zoning code to expressly add healthcare facilities in order to attract additional facilities to this area. • Mr. Quentin Kent, S. Commerce St., stated rather than building out trail systems throughout Centreville to walk you should also consider that the Town is an attraction as well and it should be walkable. The sidewalks are not walkable on every street. Page 1 of 2 Citizen Comment No citizens provided comments. Council Member Report Council President Kline stated there are two new members joining the Town Council during the reorganizational meeting, Jim Beauchamp and Dan Worth. Town Council continues to grapple with the Growth Allocation for the Carter Farm. Adjournment There being no further business, Ms. Voight moved to adjourn the October 5, 2022 Planning Commission public work shop. Ms. Fox seconded the motion, which passed unanimously. The work shop adjourned at 9:10 p.m. Respectfully submitted, Betty Jean Hall Administrative Assistant Page 2 of 2 WORKSHOP – Centreville Planning Commission Comprehensive Plan Update • Required once every 10 years. • The current plan --Centreville Community Plan was adopted in 2009. • This proposed update does not change the 2009 Plan in major ways. • It refines the 2009 Plan and major ideas intact. • It focusses on five refined goals. • And it meets new State standards for comprehensive plans. 5 Big Goals 1 Provide direction on how to expand the municipal water and sewer for the Plan system Update Develop the local economy, the commercial tax base, and ensure the 2 strong and resilient fiscal health of our local government. Organize the character and function of the Town’s existing and future 3 streets and the development that will front them. Interconnect existing and future neighborhoods with outstanding open 4 spaces and greenways that will impart a character of good health, small town vitality, and scenic beauty. Guide the location, layout, and character of future 5 neighborhoods Provide direction on how to expand the municipal water and sewer system Conditions The WWTP is permitted to discharge an average of 542,000 gpd of treated domestic wastewater, but only between December 1 and March 31. The WWTP discharges to Gravel Run which the MDE classifies as a “Use 1 Waterway The MDE permits the Town to operate a spray irrigation system for effluent disposal year-round, which the Town is required to do, in combination with discharge to Gravel Run, to provide this essential service. The WWTP recorded an average daily flow of 506,000 gpd in 2021, which is well above the three-year average noted above, and represents 93% of permitted capacity, leaving a remaining capacity of 36,000 gpd – about enough to serve 144 more houses. Recommendation: Upgrade and Expand Wastewater Treatment Capacity Modernize and Expand the Centreville wastewater treatment plant (WWTP) and its effluent discharge capacity. The decision to expand will depend on the availability of funding. Options include replacing the plant at about its same capacity of 542,000 gpd to 750,000 gpd, 1 million gpd, or 1.25 million gpd. A capacity of 1.25 million gpd would be necessary to serve the Town planned residential and employment growth through 2040. Another spray irrigation field will be needed too. Interconnect existing and future neighborhoods with outstanding open spaces and greenways that will impart a character of good health, small town vitality, and scenic beauty. Develop the local economy, commercial tax base, and ensure the strong and resilient fiscal health Complete Neighborhoods • A variety of housing types • Neighborhood level commercial uses • Parks, Greenways, Trails • Institutional uses • Walkable • Interconnected with open spaces • Interconnected with streets • Clustering and land preservation • Planned for Sustainability Household Projections: 2020 - 2040 4500 4000 Growth 3500 3000 Projection 2 Projection 3 2500 2000 Projection 1 1500 1000 500 0 2000 2010 2020 2030 2040 Households: 2020: 1,850 2040: 2,560 Change: +710 Population: 2020: 4,715 2040: 6,670 Change: +1,955 Changes LAND USE 2040 Designates Natural Areas for Open A. Space Protection Expands the CBD along Water St. B. to Little Hut Dr. and along Penn. Ave. C. Calls for the Infill Tracts to be Planned Unit Developments (PUDs) D. Institutional Areas to remain Institutional Changes GROWTH AREA A. Adds the planned County Business Park and land south of Taylor Mill Road Expands natural areas and B. designate greenways C. Add an Employment Zone on MD 213, opposite Laser Drive D. Reduces the length of “Mixed Use Corridor” E. Employment Uses at the U.S. Route 13 / MD Route 213 Interchange Changes STREETS PLAN A. East Side Parkway B. State Highways to be parkways C. Primary Local Roads to improve interconnections Greenway and Trail Plan EXPANDED TRAIL NETWORK Trails Existing Trail Programmed for Construction Planned Greenways Changes Greenway are designated in Growth Area and In-Town Trail network is expanded Vision Question Imagine you are in a future generation of Centreville Town residents (not yet born): What would impress you most about the vision of today’s citizen planners? Suggested Way to frame your answer: “I would be most impressed that they ………………!”