Sign in

← Back to the document

September 16, 2020 Planning Commission Meeting - Part 2

Document September 16, 2020 · 8 page(s) in the original

This is the document's text, extracted automatically. Headings and paragraphs are inferred from the original's layout, so the arrangement may differ from the published version — the words do not. Where it matters legally, the original governs.

Original document ↗

From Growth Area to Villages to Neighborhoods Recommended Employment Zones P Existing Intuitional uses S Planned Commercial / Mix

P

Residential InfillAreas Planned Complete Neighborhoods NewStreets PlannedGrowth Area

S P

Boundary

S

P

Possible Employment Zone

P

S

Future School

P

Future Park Planned Major Street Network Existing Planned Housing Growth 740 inside and from about 4,970 in growth area

1. Planned housing growth coordinated with water and sewer

2. Promote infilling of vacant lots, tracts and rehabbing existing

houses

3. Promote a variety of housing types in each new neighborhoods

4. Promote quality housing that is affordable to low-and-moderateincome households and seniors throughout the Town

Complete Neighborhoods

• A variety of housing types

• Neighborhood level commercial uses

• Parks

• Institutional uses

• Walkable

• Interconnected with open space

• Interconnected with streets

playground Special Destination Park Major Park ballfields Planned Open Spaces and Relationship to Housing Interconnecting Park Note housing types fronting park Employment Zones

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.