Sign in

← Back to the document

ceda_meeting_5-19-26-website_packet.pdf

Document Date unknown · 7 page(s) in the original

This is the document's text, extracted automatically. Headings and paragraphs are inferred from the original's layout, so the arrangement may differ from the published version — the words do not. Where it matters legally, the original governs.

Original document ↗

Centreville Economic Development Authority Meeting Agenda Tuesday, May 19, 2026 Centreville Wharf, 101 Water Way First Floor Meeting Room Call to Order Welcome by: - Frederick Beu, Town Council Member

- Overview and Objectives for Today

Carolyn Brinkley, Town Manager & Gaye Adams, Town Clerk CEDA Members: Personal Introductions and Background -Carol Dagostino: Main Street Manager – non-voting member -Katie Blackburn, QAC Arts Council Representative -Chris Rosendale, Realtor, Representative from the real estate sector -Frank Divilio , State Farm Agent, Local Business Owner -Christy Puglisi, Owner of multiple buildings in downtown Centreville

-Pat Fox, Resident with ED experience and on Planning Commission for over 8 years -Scott Eggert, Resident and business owner -Harry Kaiser, Realtor, Resident with experience owning multiple commercial properties

• Debbie Gill, QAC Economic Development Coordinator

• Peter Flint, Centreville Zoning Administrator

• Carol D’ Agostino, Main Street Manager- Booms Tracker

Open Discussion:

- Your Economic Development Ideas, Suggestions and Priorities for Centreville

- Pennsylvania Avenue Project Discussion

Schedule Next Meeting: June 23rd @ 6:00 PM. – Is this good for everyone?

Selection of CEDA Chairperson Adjourn BOOMS Tracker Dashboard Background Created by Main Street America, the Building Opportunities on Main Street (BOOMS) Tracker is an interactive, map-centric tool. BOOMS Tracker enables Main Street leaders to efficiently gather, store and update details about buildings and parcels in their district. For the first time, Main Street communities have a reliable system for tracking vacancies and other property-related data, such as

building ownership, in their districts – in one place.

Interpreting the Data The BOOMS Tracker was also designed to streamline the process of interpreting and referencing property data, allowing Main Street programs at the local, regional, and national level to identify and quantify the opportunities in their vacant and idle spaces. This data can be used for various purposes, including attracting investment and development, advocacy work, and bolstering the leadership role of

Main Street programs in their communities.

For instance, data on repairs and maintenance needs entered into BOOMs Tracker can help create budgets for façade improvement grants and to substantiate the need in the grant application.

Other uses for data include:

• Analyzing available housing units to determine needs for new housing initiatives.

• Using vacant property information to provide leads for interested operators.

• Showcasing upper floor availability to support encouraging property and business owners to

move offices to the second floor to keep consumer-facing retail on the street level.

• Bringing summary data from BOOMs Tracker into a conversation with the local economic

development office to compare information, talk strategy, and collaborate effectively.

- Submitted by Centreville Main Street

August 14, 2013

+/- (6) PARALLEL PARKING

BENCHES (TYP.) NEW SWM FACILITIES (TYP.)

TRAIN CABOOSE TRAIN TRACKS

SHADE TREE +/- (4) PARALLEL PARKING

6’ DIA. FOUNTAIN BIKE RACKS

CONNECT TO

(46) PARKING

8’ PROMENADE (24) PARKING PRICE STREET

+/- 12 UNITS

+/- 12 UNITS

+/- 12 UNITS

+/- 12 UNITS

APARTMENTS

APARTMENTS

APARTMENTS

+/- 10,800SQ.FT.

+/- 10,800SQ.FT.

+/- 10,800SQ.FT.

2 STORY

2 STORY

2 STORY

5’ HEDGE

+/- (5) PARALLEL PARKING +/- (8) PARALLEL PARKING +/- (6) PARALLEL PARKING

SHADE TREE

POSSIBLE SWM POSSIBLE SWM

30’X30’ PLAZA

NOTES:

Concept Design - Option 1

+/- 36 UNITS @ 0.5-1.3 SPOT PER UNIT

Railroad Property

18-47 SPOTS REQUIRED

76 PROVIDED OFF STREET

North Centreville Heritage Management Plan Centreville, MD Scale: 1” = 60’-0” 0 30 60 120 180 August 14, 2013

6’ DIA. FOUNTAIN

8’ PROMENADE WITH TRAIN

18’ ALLEY (TYP.) EXISTING SWM FACILITY

RAILS IN PAVING

NEW SWM FACILITY

BENCHES TRAIN CABOOSE GARAGES (TYP.)

PATH TO SENIOR CENTER

(4) 40’X130’

VILLAGE COTTAGE LOTS

(5) 25’X100’ (5) 25’X115’

TOWNHOME LOTS TOWNHOME LOTS

5’ HEDGE GAZEBO (5) PARALLEL PARKING (5) PARALLEL PARKING (8) PARALLEL PARKING

BIKE RACKS

SHADE TREE

30’X30’ PLAZA

Concept Design - Option 2 Railroad Property Centreville Heritage Management Plan North Centreville, MD Scale: 1” = 60’-0” 0 30 60 120 180

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.