april 17 2024 planning commission packet
Document April 17, 2024 · 34 page(s)
Read as text View original PDF ↗ Meeting
This packet is for the Centreville Planning Commission meeting on April 17, 2024. It centers on a site‑plan resubmission and variance application from Tred Avon Partners / Dumb Home, LLC for a proposed mixed‑use building at 216 N. Commerce St., asking the Commission to (1) send a positive recommendation to the Board of Zoning Appeals on a driveway‑setback variance (reducing the 7.5' requirement to 0.5') and (2) grant conditional site‑plan approval. The applicant describes plan revisions made after February feedback (parking, site amenities, compliance with Design Standards), includes updated architectural sheets, and notes technical statuses: Soil Conservation District will sign erosion & sediment controls once plans are approved, Queen Anne’s County DPW stormwater review is still pending, and the applicant is considering reducing a 6" water meter to 4". The meeting agenda also includes discussion of the proposed Providence Farm annexation, Planning & Zoning bylaw changes, draft zoning map amendments, HB0538, and miscellaneous correspondence and reports.
Show the raw extracted text
Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.
CENTREVILLE PLANNING COMMISSION April 17, 2024 Liberty Building - 2nd Floor 107 North Liberty Street 7:00 p.m. A G E N D A I. CALL TO ORDER – Kara Willis – Chair II. Chair’s Announcements III. Review of Minutes from Previous Meetings a. March 20, 2024 meeting minutes b. April 3, 2024 work session minutes IV. Opening Statement V. Citizen Comment (Citizens are requested to keep their comments to three minutes) VI. Appearances a. Variance Request and Final Site Plan Submittal – 216 N. Commerce Street, Mixed-Use Building; Tred Avon Partners, LLC, Owner; Steve Layden, P.E., LEED AP, Dumb Home, LLC VII. New Business a. Proposed Providence Farm Annexation items for discussion VIII. Old Business a. Planning & Zoning Commission Bylaw changes b. Draft Zoning Map Amendments IX. Zoning Issues – Discussion a. HB0538 – discussion X. Miscellaneous Business / Correspondence a. MD Dept. of Housing & Community Development Day Trips tour b. Approved Building Permits list issued March 2024 XI. Citizen Comment (Citizens are requested to keep their comments to three minutes) XII. Council Member Report XIII. Adjournment Dumb Home, LLC 309 Windsor Ave Centreville, MD 21617 301-529-2368 dumbhome@gmail.com compacthomeplans.com April 3, 2024 Town of Centreville Planning Commission Kara Voight, Chair 101 Lawyer’s Row Centreville, MD 21617 RE: Site Plan Planning Commission Submittal #2 – Tred Avon Partners, LLC 216 N Commerce St Mixed-Use Building Dear Ms. Voight: Please accept this site plan resubmission for review and placement on the April 17th Planning Commission (PC) agenda. As described in the enclosed Board of Zoning Appeals (BOA) cover letter, we are submitting 17 copies of various items that double for the Board and yourselves. Please note that we are requesting the PC perform two tasks on the 17th: vote to send a letter of positive recommendation to the BOA for our requested variance, and to vote to grant conditional site plan approval for the proposed project. We always expect conditions of site plan approval to obtain all necessary plan signatures & approvals, approval of a public works agreement, etc. We are picturing approval of the BOA variance would just involve an additional condition. We appreciate the Commission's feedback at the February meeting, which essentially evolved into a design Charrette with regard to parking and site amenities. We have made edits to the Site Plan (Sheets 1 and 3) in order to incorporate the PC’s feedback and our team’s efforts to better comply with the Design Standards. We have provided red revision clouds around the areas that have been changed so it is easier to focus on those revisions. Please note that we will be updating the remaining plan sheets accordingly prior to requesting final approvals and plan signature. For the purposes of our presentation to the Planning Commission, the recent revisions do not affect the SEC, SWM or Utility designs. Please note that the first sheet of the enclosed Architectural Plans is largely unchanged, but that the building height has been added on the bottom left of the sheet. The second sheet has been added to show the proposed floor plan layouts as a courtesy to the PC members. Regarding the Design Standards, we believe the enclosed letter is self-explanatory when you read the letter side-by-side with the standards document. We look forward to continuing our discussion of the site amenities and the project in general on the 17th. For your information, the TAC did not provide any new comments relative to the site or architectural plans, but they did provide guidance on the need for a BOA variance. The Soil Conservation District has reviewed the Sediment & Erosion Control plans and are prepared to sign off on them once the plan set Tred Avon Partners – 216 N. Commerce St Planning Commission Resubmittal #1 Cover Letter April 2, 2024 Page 2 is approved by you all and any other required plan revisions are completed. As of the date of this letter, we have not received review comments from the Queen Anne’s County Department of Public Works regarding the stormwater management plan and report. In the near future, we intend to discuss the possibility of shrinking the proposed water meter because the nearby fire hydrant flow test indicates that a 4” water meter will be adequate compared to the 6” meter currently shown. We trust that a smaller meter would be preferred by the PC so as to be less intrusive visually. Please do not hesitate to reach out if you have any additional questions or would like us to bring any additional information or exhibits to the meeting. Sincerely, Steve Layden, P.E., LEED AP pdf: Bo Feaga, Tred Avon Partners, LLC Greg Torchio, Torchio Architects, Inc. Dumb Home, LLC 309 Windsor Ave Centreville, MD 21617 301-529-2368 dumbhome@gmail.com compacthomeplans.com April 3, 2024 Town of Centreville Board of Zoning Appeals Frederick Beu, Chair 101 Lawyer’s Row Centreville, MD 21617 RE: Variance Application – Tred Avon Partners, LLC 216 N Commerce St Mixed-Use Building Dear Mr. Beu: Please accept this site plan submission and variance application for consideration and to be scheduled at your earliest convenience. We are providing 17 copies of the items listed below (one full size and sixteen 11x17) as well as digital scans: 1. Fee check for $300 2. Variance Application form 3. “Site and Construction Plan” Sheets 1-3 (Sheets 4-9 are technical in nature and have no substantive revisions as compared the 12/1/23 plan set.) 4. Schematic Design rendering, elevations and floor plans by Torchio Architects 5. Cover Letter for April 17th Planning Commission meeting 6. Letter describing the project's compliance with the Centreville Design Standards (CDS) Please note that this submittal doubles as a re-submittal of the site plan for consideration by the Planning Commission (PC) on April 17, 2024. The items listed above address comments and issues discussed during our presentation to the PC on February 21, 2024, and we have made minor revisions to the architectural plans and engineering site plans as a result. For the purposes of your evaluation of the variance application, we expect you will focus on Items #2 and 3, and the remaining items may be of interest in understanding the overall project goals and design feature. As noted on the application form, the purpose for this application is that the Centreville Zoning Code 170-32 C.2.d. requires driveway entrances to be located at least 7 1/2 feet from side lot lines. We are requesting a reduction so that the face of curb is 0.5’ from the right-side lot line. This is necessary to provide width for the required 14’ wide entrance driveway and still leave room for a commercially viable building, as well as the existing driveway encroachment on the left side of the lot. In support of our request, we ask that you keep in mind that the property is zoned Central Business District (CBD). Please review the Sheet 3 site plan and observe the entrance driveway configuration, building size & layout, and the driveway encroachment on the left (north) side from the Echo 5 LLC property. We believe it is obvious that it is not possible to develop the 59’ wide lot in a way that is typical of existing lots within the CBD district while still complying with 7.5’ separation requirement. Tred Avon Partners – 216 N. Commerce St Board of Zoning Appeals Variance Application April 2, 2024 Page 2 We do not believe this provision in the code was intended to limit the footprint size or floor area of proposed building improvements in the CBD zone. Compliance with the standard would have the practical effect of forcing the propose building to be narrowed from 32’ wide to 25’, (a 22% reduction in width and floor area). Moreover, providing a 7.5’ separation makes perfect sense for projects in less dense zoning districts that require more landscaping and side bufferyards, such as the commercial entrances along Roue 213 from the split at Citgo, south through the Food Lion shopping center. It is not compatible with existing development in the CBD zone. In addition, we would like to note that this requirement is not met by approximately 25 existing properties/sites within the CBD zone as marked on the attached annotated zoning map. For this reason, we do not believe that granting the variance will give the applicant a benefit that is more advantageous than any existing property in the downtown area. We would also like to note that the Town Planner has indicated unofficially that the 7.5’ separation requirement is not appropriate in the CBD zone and recommends that the code be revised. We look forward to presenting the project to you in the near future and discussing these issues in more depth. We are also open to hearing if you have particular concerns or would like us to prepare additional exhibits prior to the hearing in order for us to make the best possible information available to you at the hearing. Sincerely, Steve Layden, P.E., LEED AP pdf: Bo Feaga, Tred Avon Partners, LLC Greg Torchio, Torchio Architects, Inc. HTIWSTOLGNIWOHSTIBIHXE OT'5.7NAHTRESOLCSYAWEVIRD ENILYTREPORPEDISEHT EHTFOPOTNONWARDSNOITATONNA( )PAMGNINOZELLIVERTNECELACS-OT-TON 420234 GNIMROFNOC-NONFONOITACOL = YAWEVIRD dotloop signature verification: dtlp.us/3xUK-VxKL-RQsM dotloop verified Michael Bradley 04/02/24 9:48 PM EDT XXSV-0DSR-04EJ-KLRL Michael Bradley dotloop verified Michael Bradley 04/02/24 9:48 PM EDT SH9Z-TWYO-6PRI-VDFV dotloop signature verification: dtlp.us/3xUK-VxKL-RQsM dotloop verified Michael Bradley 04/02/24 9:48 PM EDT 04/02/2024 JMCJ-P8HH-FXWU-JMJC dotloop verified Michael Bradley 04/02/24 9:48 PM EDT 04/02/2024 MVAY-XXVZ-PXBJ-OEH3 SITEANDCONSTRUCTIONPLANS 216NCOMMERCESTMIXED-USEBUILDING SITE,SEC,STORMWATERMANAGAGEMENT,ANDUTILITYPLANS SITENOTES D R N 1. PROPERTYSHOWNHEREONISDESIGNATEDASTAXMAP44C,GRID8,PARCEL778. W O T 2. DEEDREFERENCE:4249130 ANDPLATREFERENCE: E R T S 3. THISSITEISZONEDCBD-CENTRALBUSINESSDISTRICT E H C 3.1. FRONTSETBACK =0FEET T O 432024 3.2. SIDESETBACK =0FEET PLAN 3.3. REARSETBACK =5FEET SITESTATISTICS 4. EXISTINGUSE:VACANT 5. PROPOSEDUSE:MIXEDCOMMERCIALANDRESIDENTIALAPARTMENT TOTALSITEAREA= (cid:27)(cid:15)(cid:25)(cid:25)(cid:25)(cid:3)(cid:54)(cid:41)(cid:147) (cid:19)(cid:17)(cid:20)(cid:28)(cid:28)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) EXISTINGIMPERVIOUSAREA(6.5)= (cid:3)(cid:3)(cid:3)(cid:24)(cid:25)(cid:21)(cid:3)(cid:54)(cid:41)(cid:147) (cid:19)(cid:17)(cid:19)(cid:20)(cid:22)(cid:3)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) 6. PROPERTYLINESSHOWNHEREONAREBASEDONASURVEYTITLED,"SURVEYONTHE IMPERVIOUSAREATOBEREMOVED= (cid:3)(cid:3)(cid:3)(cid:23)(cid:26)(cid:20)(cid:3)(cid:54)(cid:41)(cid:3)(cid:147) (cid:19)(cid:17)(cid:19)(cid:20)(cid:20)(cid:3)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) LANDSOFTREDAVONPARTNERS,LLC"PREPAREDBYMICHAELA.SCOTT,INCDATED IMPERVIOUSAREATOBEADDED= (cid:26)(cid:15)(cid:20)(cid:19)(cid:27)(cid:3)(cid:3)(cid:54)(cid:41)(cid:3)(cid:147) (cid:19)(cid:17)(cid:20)(cid:25)(cid:22)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) OCTOBER,2023. RD RESULTINGIMPERVIOUSAREA(83.0)= (cid:26)(cid:15)(cid:20)(cid:28)(cid:28)(cid:3)(cid:54)(cid:41)(cid:3)(cid:147) (cid:19)(cid:17)(cid:20)(cid:25)(cid:24)(cid:3)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) 7. TOPOGRAPHYWASOBTAINEDFROMTHEAFOREMENTIONEDSURVEYANDISONAN MAXIMUMIMPERVIOUSAREA(85)= (cid:26)(cid:15)(cid:22)(cid:25)(cid:25)(cid:3)(cid:54)(cid:41)(cid:3)(cid:147) (cid:19)(cid:17)(cid:20)(cid:25)(cid:28)(cid:3)(cid:3)(cid:36)(cid:38)(cid:17)(cid:3)(cid:147) ASSUMEDHORIZONTALANDVERTICALDATUM. 8. THEPROPERTYISSERVEDBYTHEPUBLICWATERANDSEWER. 9. SOILSWITHINTHELIMITOFDISTURBANCECONSISTENTIRELYOFINGLESIDESANDYLOAM PARKINGCALCULATIONS (IgA),HYDROLOGICSOILGROUPA,KFACTOR0.15,ASPERTHEUSDA-NRCSWEBSOIL SITE SURVEYASOFOCTOBER2023. 900S.F.COMMERCIAL@1SPACEPER300SF= 3SPACES 10. THEPROPERTYISNOTLOCATEDWITHINTHEONEPERCENTCHANCEFLOODPLAIN ONE1-BRRESIDENTIALAPARTMENT@1.5SPACESEACH= 1.5SPACES ACCORDINGTOTHEFEDERALEMERGENCYMANAGEMENTAGENCY'SF.I.R.M.MAPFOR FOUR2-BRRESIDENTIALAPARTMENTS@2.25SPACESEACH= 9SPACES QUEENANNE'SCOUNTY,PANELNO.24035C0212D,DATED:11052014. TOTALPARKINGSPACESREQUIREDPERTOWNCODE= 14SPACES 11. THEPROPERTYISNOTLOCATEDWITHINTHECHESAPEAKEBAYCRITICALAREA. REDUCEDPARKINGCREDITPER170-32B.2.BASEDONANNEARUNDELCOUNTY 12. THEREAPPEARTOBENONON-TIDALWETLANDSONTHEPROPERTY. PARKINGSTANDARDS(14REDUCTION) 2SPACEREDUCTION 13. THEREARENOSTEEPSLOPESONTHEPROPERTY. (ONE1-BRAPT.@1SPC.UNIT+FOUR2-BRAPTS.@2SPC.UNIT 1+8=9SPACESREQUIREDFORDWELLINGSINAACOUNTYPER18-3-104 14. NOFORESTISPROPOSEDTOBEDISTURBEDASPARTOFTHEPROPOSEDDEVELOPMENT. 15. THEPROPERTYDOESNOTAPPEARTOCONTAINRARE,THREATENEDORENDANGERED TOUS301 SHARE C D O P M A P R A K R IN E G D C TO R 1 E 1 D S IT P P A E C R E 1 S 7 R 0 E -3 Q 2 U B I . R 3. E F D O B R Y O C F E F N S T E R T E C V O I M LL M E E C R O C D I E A ) L SPECIESHABITATANDISNOTMAPPEDASASENSITIVESPECIESPROJECTREVIEWAREA ANDRESIDENTIALPARKINGTIMES*= 3SPACEREDUCTION ASOFNOVEMBER2023. * NOTETHATTHELEASEDOCUMENTFORTHECOMMERCIALSPACEISPROPOSEDTO VICINITYMAP INCLUDELANGUAGETHATTHATEMPLOYEESANDCUSTOMERSAREREQUESTEDTO SCALE:1"=1000' UTILIZEON-STREETPARKINGSPACESATALLTIMES. GENERALNOTES 1. THEEXISTINGUTILITIESSHOWNINTHESEDRAWINGSISBASEDONBESTAVAILABLEINFORMATION,AND NETREQUIREDPARKINGSPACESREQUIRED= 9SPACES WEARENOTAWAREOFANYUNDERGROUNDUTILITIESONTHEPROPERTY.NOGUARANTEETOTHE INDEXOFDRAWINGS ACCURACYOFTHELOCATION(HORIZONTALORVERTICAL)ISMADEBYTHEENGINEER.CONTRACTORTO ONSITESPACESPROVIDED= 8SPACES FIELDVERIFYANDTESTPITASNEEDEDTOVERIFYTHELOCATIONOFTHEEXISTINGUTILITIES.THIS PARKINGCREDITPER170-32A.OFFSITEPARKINGCREDITED SHALLBEDONEASPARTOFTHECONTRACTFORTHEWORKSHOWNINTHESEDRAWINGS.ANYDAMAGE SHEET DESCRIPTION TOTHESITE: INCURREDTOSUCHUTILITIESSHALLBEREPAIREDIMMEDIATELYATTHECONTRACTOR'SEXPENSE. 1 TITLESHEET REQUESTING3ON-STREETPARKINGSPACESONNCOMMERCE 2. THECONTRACTORSHALLNOTIFYTHEFOLLOWINGTWO(2)WEEKSPRIORTOTHESTARTOF 2 EXISTINGCONDITIONSPLAN STREETBECREDITEDTOWARDTHEPROPOSEDDEVELOPMENT CONSTRUCTIONTOSCHEDULEAPRE-CONSTRUCTIONMEETING: 3 SITEPLAN FORTHECOMMERCIALAPARTMENT. 3SPACES 4 GRADING&SEDIMENT&EROSIONCONTROLPLAN MDDEPARTMENTOFTHEENVIRONMENTINSPECTOR 410-901-4020 5 STORMWATERMANAGEMENTPLAN (NOTETHATADDITIONALON-STREETPARKINGSPACESAREAVAILABLEINTHE TOWNOFCENTREVILLEDEPT.OFPUBLICWORKS 410-758-1180 6 UTILITYPLAN COURTHOUSESQUAREAREA,ASWELLASOFFSITESPACESBEINGAVAILABLEIN QUEENANNE'SCOUNTYDEPT.OFPUBLICWORKS 410-758-0925 7 SEDIMENT&EROSIONCONTROLDETAILS THEADJACENTDEPARTMENTOFHEALTHPARKINGLOT.) DELMARVAPOWER 410-758-0830 8 STORMWATERDETAILS MISSUTILITY 800-441-8355 9 STORMTECHDETAILS TOTALPARKINGSPACESPROVIDED= 11SPACES DUMBHOME,LLC 1-410-758-2237 INCLUDINGONEHANDICAPPARKINGSPACE 3. ALLCONSTRUCTIONWITHINPUBLICANDPRIVATEROADSSHALLBEMARKEDFORTRAFFICAND OWNERDEVELOPER PREMISEADDRESS PEDESTRIANSAFETY.ALLSIGNSSHALLBEPLACEDINACCORDANCEWITHSECTIONVIOFTHEMANUAL ONUNIFORMTRAFFICCONTROLDEVICES. TREDAVONPARTNERS,LLC 216NCOMMERCEST 4. ALLMATERIALSANDMETHODSOFCONSTRUCTIONSHALLBEINCONFORMANCEWITHTHETOWNOF POBOX387 CENTREVILLE,MD21617 CENTREVILLEDEPARTMENTOFPUBLICWORKS. 11MARCIALN 5. THECONTRACTORASSUMESALLRESPONSIBILITIESFORANYDEVIATIONSFROMTHESEPLANS,UNLESS DORSET,VT05251 SAIDDEVIATIONISAPPROVEDBYTHEENGINEER.THECONTRACTORSHALLRECEIVEWRITTEN (443)480-2532 PERMISSIONFROMTHEENGINEERIFADEVIATIONOFTHEPLANISNECESSARY. SURVEYOR ENGINEER 6. ALLDISTURBEDAREASSHALLBESMOOTHLYGRADEDTOPROVIDEPOSITIVEDRAINAGEINTHEDIRECTION PLANNINGCOMMISSIONCERTIFICATE OFFLOWARROWS,SPOTGRADES,ANDCONTOURSSHOWNHEREONANDSTABILIZEDWITHTOPSOIL, SEED,ANDMULCH.IFSETTLEMENTOCCURS,TOPSOIL,SEEDINGANDMULCHINGSHALLBEREPEATED MICHAELA.SCOTT,INC. DUMBHOME,LLC THISISTOCERTIFYTHATTHISSITEPLANWASAPPROVEDBY UNTILSETTLEMENTSUBSIDES(SEEEROSIONANDSEDIMENTCONTROLSPECIFICATIONS). 400SCROSSST,STE4 309WINDSORAVE THECENTREVILLEPLANNINGCOMMISSIONONTHE DAY 7. ALLTRASH,TREES,DEMOLITIONDEBRIS,ANDUNDERBRUSHARETOBECLEAREDANDREMOVEDOFF CHESTERTOWN,MD21620 CENTREVILLE,MD21617 OF ,20 . SITETOANAPPROVEDDUMPSITEBYTHECONTRACTOR. PHONE:(410)778-2310 PHONE:(301)529-2368 8. ANYEXCESSEXCAVATEDMATERIALPLACEDOUTSIDEOFTHOSEAREASDESIGNATEDONTHISPLAN SHALLMEETAPPROVALOFTHETOWNANDQUEENANNE'SCOUNTYINSPECTORSANDENGINEER. . 9. ANYEXISTINGSURVEYMONUMENTATIONTHATISDISTURBEDDURINGCONSTRUCTIONSHALLBE SIGNATUREDATE REPLACEDBYAREGISTEREDSURVEYORATTHECONTRACTOR'SEXPENSE. 10. ALLFILLAREASWITHINLIMITSOFPAVEMENT,BUILDINGCONSTRUCTION,ANDOTHERAREASAS DESIGNATEDONTHESEPLANSSHALLBECOMPACTEDTO95MODIFIEDPROCTORDENSITYANDLAID DEPARTMENTOFEMERGENCY ANDCOMPACTEDIN8"MAXIMUMLIFTS. SEDIMENT&EROSIONCONTROL SERVICESOFFICEOFTHEFIRE 11. ALLFILLAREASWITHINLIMITSOFWALKS,PATIOS,ETC.SHALLBECOMPACTEDTO90MODIFIED PROCTORDENSITYANDLAIDANDCOMPACTEDIN8"MAXIMUMLIFTS. SITEINFORMATION: MARSHALCERTIFICATE 12. IFPOSSIBLE,EXCAVATIONSANDTRENCHESSHALLNOTREMAINOPENOVERNIGHT.IFITISNECESSARY FORTRENCHESTOREMAINOPEN,STEELPLATES,CAPABLEOFBEARINGTRAFFIC,SHALLBEUSEDTO TOTALSITEAREA 8,666 SQ.FT. THISISTOCERTIFYTHATTHISSITEPLANWASAPPROVEDBYTHEQUEEN COMPLETELYCOVERTHETRENCHORSAFETYFENCINGSHALLBEINSTALLEDTOCOMPLETELYENCLOSE LIMITOFDISTURBANCE(ONSITE) 8,666 SQ.FT ANNE'SCOUNTYDEPARTMENTOFEMERGENCYSERVICES-OFFICEOF THEFIREMARSHALONTHE DAYOF ,20 . THEEXCAVATIONORTRENCH. PROPOSEDIMPERVIOUSAREA 7,199 SQ.FT VEGETATIVELYSTABILIZEDAREA 1,467 SQ.FT 13. THECONTRACTORSHALLPROVIDETHEQUEENANNE'SCOUNTYSWMINSPECTORANDTHETOWNOF LIMITOFDISTURBANCE(OFFSITE) 50 SQ.FT CENTREVILLEWITHASETOFRED-LINEDAS-BUILTSOFTHEPROPOSEDSTORMWATERFACILITIES.RED OFFSITEIMPERVIOUSAREA 50 SQ.FT LINESSHALLSHOWTHEHORIZONTALANDVERTICALLOCATIONOFALLUNDERGROUNDPIPINGAND JEFFREYMORGAN,FIREMARSHAL. TOTALLIMITOFDISTURBANCE 8,716 SQ.FT STRUCTURESASSURVEYED,BEFOREBEINGBACKFILLED. APPROVEDBY: APPROVEDBY: REVISIONS: DATE: DumbHome,LLC TITLESHEET SHEET: ProfessionalCertification: DECEMBER1,2023 Iherebycertifythatthese 309WindsorAve 1192024 ADDRESSTACCOMMENTS,SUBMITFORPLAN.COM. TOWNOF SCALE: documentswere Centreville,MD21617 216NCOMMERCEST 1 TOWNOFCENTREVILLEENGINEER DATE QACo. DEPT.OFPUBLICWORKS DATE 432024 SITELAYOUTREVISIONSPERPLANNINGCOMMISSION 1"=60' preparedorapprovedby dumbhome@gmail.com CENTREVILLE, me,andthatIamaduly MIXED-USEBUILDING www.dumbhome.com licensedProfessional MARYLAND APPROVEDBY: JOBNUMBER: Engineerunderthelaws 301-529-2368 3RDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MD 23-013 oftheStateofMaryland, LicenseNo.31184, TAXMAP44C,GRID8,PARCEL778 of 9 DESIGNER: ExpirationDate:1-16-25. DATE: PREPAREDFOR:TREDAVONPARTNERS,LLC QACo. SOILCONSERVATIONSERVICE DATE SEL COPYRIGHT C 2024 LEGEND EXISTING X SS S CO W M SOILBORINGLOCATION LIMITOFDISTURBANCE SILTFENCE SUPERSILTFENCE FILTERLOG STABILIZED CONSTRUCTIONENTRANCE TEMP.STOCKPILELOCATION APPROVEDBY: APPROVEDBY: REVISIONS: DATE: DumbHome,LLC EXISTINGCONDITIONSPLAN SHEET: ProfessionalCertification: DECEMBER1,2023 Iherebycertifythatthese 309WindsorAve 1192024 ADDRESSTACCOMMENTS,SUBMITFORPLAN.COM. TOWNOF SCALE: documentswere Centreville,MD21617 216NCOMMERCEST 2 TOWNOFCENTREVILLEENGINEER DATE QACo. DEPT.OFPUBLICWORKS DATE 432024 SITELAYOUTREVISIONSPERPLANNINGCOMMISSION 1"=20' preparedorapprovedby dumbhome@gmail.com CENTREVILLE, me,andthatIamaduly MIXED-USEBUILDING www.dumbhome.com licensedProfessional MARYLAND APPROVEDBY: JOBNUMBER: Engineerunderthelaws 301-529-2368 3RDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MD 23-013 oftheStateofMaryland, LicenseNo.31184, TAXMAP44C,GRID8,PARCEL778 of 9 DESIGNER: ExpirationDate:1-16-25. DATE: PREPAREDFOR:TREDAVONPARTNERS,LLC QACo. SOILCONSERVATIONSERVICE DATE SEL COPYRIGHT C 2024 S.H.A.MIXNo.2 LEGEND 5'-6" 1"RADIUS 6" CONCRETEOR PRECAST 1 EXISTING PROPOSED FINISHEDGRADE 2MAX. SCORE 1"RADIUSNOSING 2 ORBUILDING PAVEMENT 6" 3 4"THICK 6" ASPHALT SUB-GRADE 4"CR-6 PAVEMENT 18" VARIES 20 21 84" 1' SUBGRADEANDCR-6 SUB-BASE TOBECOMPACTEDTO 1.5 95MODIFIED 9 " PROCTORDENSITY SUBGRADEANDCURB BASETOBECOMPACTED TO95MODIFIED 3"BANKRUN NOTES: CONCRETEMD. PROCTORCOMPACTION GRAVELORCR-6 1) PROVIDECONTROLJOINTSEVERY5'ANDEXPANSION 4" S.H.A.MIXNO.2 JOINTSEVERY15'. 6" 3000PSI28DAY 2) PROVIDEABROOMFINISH. COMPRESSIVE STRAIGHT6"CURBDETAIL 3) ALLWALKSSHALLMEETAPPLICABLEADASTANDARDS. STRENGTH 4) THISSECTIONISNOTAPPROPRIATEFORTRAFFIC NOTTOSCALE BEARINGLOCATIONSORATDUMPSTERPADS. MONOLITHICSIDEWALKANDCURBDETAIL X SS S SS CO CO W W M M O.W. RD E E SOILBORINGLOCATION 1 2 1 VARIES 5'-0" 1'-0" 2MAXSLOPE 4"(6"@DRIVEWAYSW6X6 WELDEDWIREMESH(GAGE10) 4"CR-6BASE 4000PSICONCRETE (6"CR-6UNDERDRIVEWAYS) PREFORMEDEXPANSION 12" JOINTMATERIAL 4"MIN. 4"CR-6BASE (6"CR-6UNDERDRIVEWAYS) EXPANSIONJOINTDETAIL GENERALNOTE: 1.CONSTRUCTIONJOINTSAT5'INTERVALS. 2.EXPANSIONJOINTSAT25'INTERVALS. SIDEWALKDETAIL NOTTOSCALE APPROVEDBY: APPROVEDBY: REVISIONS: DATE: DumbHome,LLC SITEPLAN SHEET: ProfessionalCertification: DECEMBER1,2023 Iherebycertifythatthese 309WindsorAve 1192024 ADDRESSTACCOMMENTS,SUBMITFORPLAN.COM. TOWNOF SCALE: documentswere Centreville,MD21617 216NCOMMERCEST 3 TOWNOFCENTREVILLEENGINEER DATE QACo. DEPT.OFPUBLICWORKS DATE 432024 SITELAYOUTREVISIONSPERPLANNINGCOMMISSION 1"=20' preparedorapprovedby dumbhome@gmail.com CENTREVILLE, me,andthatIamaduly MIXED-USEBUILDING www.dumbhome.com licensedProfessional MARYLAND APPROVEDBY: JOBNUMBER: Engineerunderthelaws 301-529-2368 3RDELECTIONDISTRICT,QUEENANNE'SCOUNTY,MD 23-013 oftheStateofMaryland, LicenseNo.31184, TAXMAP44C,GRID8,PARCEL778 of 9 DESIGNER: ExpirationDate:1-16-25. DATE: PREPAREDFOR:TREDAVONPARTNERS,LLC QACo. SOILCONSERVATIONSERVICE DATE SEL COPYRIGHT C 2024 "5.7 SAWCUTEX.CURBTONEARESTJOINTANDPOURNEW3'RADIUSCURBANDNOSEDOWN FLUSHWITHPROPOSEDSIDEWALK. SAWCUTEX.ASPHALTANDPAVEPROPOSEDCONCRETEAPRONFLUSH. SEEELECTRICALPLANSFORPROPOSEDWALL-MOUNTEDPARKINGLOTLIGHTING. 432024 4 HANDICAPPARKINGSIGNFASTENEDTOBUILDINGWALLPERDETAILTHISSHEET. 5 9'x9'FENCEDTRASHCORRAL.FENCINGSHALLBE5'HIGHWHITEVINYLWITHA4'WIDE LATCHINGDOOR.CONCRETEPADSHALLBE4"CONCRETEON4"CR-6PERSIDEWALK DETAILTHISSHEET. 6 5'x2'DETECTABLEWARNINGSURFACEPERMSHADETAIL655.40ONSHEET7. 432024 7 PROPOSEDTWO-PERSONBENCHFIXEDTO5'x7'-6"STAINED&PATTERNEDCONCRETE. 8 SEEARCHITECTURALSFORHANDRAILTHATLIMITSACCESSFROMSTREETSIDEONLY. 9 PROVIDESAFETYCONESANDWARNINGSIGNAGETODIRECTPEDESTRIANAWAYFROM CONSTRUCTIONZONE 7'-0"LONG,370LBS.,TWO58"X18"ANCHORPINS. SPECIFICATIONSFORQUALITY:SMOOTHSTEELFORM 10 PROPOSEDTWO-BIKEBLACKSTEELU-RACKFIXEDTOCONCRETEWALK FINISH,HIGHSTRENGTH-4500P.S.I. 11 PROPOSEDPICNICTABLEANDFIXEDCHARCOALGRILL 432024 TYPICALPARKINGBLOCKDETAIL 12 4"WHITEPAINTSTRIPES24"APARTDENOTEHANDICAPREFUGEAREAANDTURN- AROUNDATTRASHCORRAL NOTTOSCALE A AMERICANHOLLY ILEXOPACA, 8'HIGH B SWEETBAYMAGNOLIA, MAGNOLIAVIRGINIANA, 6'HIGH 432024 NOTES: 1. SIGNSHALLMEETTHEMUTCD STANDARDSFORANR7-1SIGN. 2. PAINTSHALLBEREDONWHITE. 3. SIGNINSTALLEDIONBUILDINGWALL WITHBOTTOMEDGE6'-0"ABOVE WALK ALUMINUM 432024 SIGNSTOCK COMPACTEDFILLORSUBGRADE WITH GRAPHICS PERMUTCD REQUIREMENTS TREECANOPYCALCULATIONS 432024 TOTALSITEAREA= (cid:27)(cid:15)(cid:25)(cid:25)(cid:25)(cid:3)(cid:54)(cid:41)(cid:147) PERCENTAGEOFTREECOVERREQUIRED(15)= (cid:20)(cid:15)(cid:22)(cid:19)(cid:19)(cid:3)(cid:54)(cid:41)(cid:147) SEEPLANFOR PROPOSEDTREES ARROWDIRECTION 1MEDIUMTREE(900SFPERTABLEA) 900SF 432024 1SMALLTREE(400SF) 400SF TOTALPROPOSEDTREECANOPY 1,300SF PARTIALELEVATION NOTTOSCALE NOPARKINGSIGNDETAIL NOTTOSCALE COMMERCE STREET VIEW WEST ELEVATION SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION SCALE: 1/8"=1'-0" SCALE: 1/8"=1'-0" SCALE: 1/8"=1'-0" SCALE: 1/8"=1'-0" 01 :: 216 NORTH COMMERCE STREET MIXED USE BUILDING :: SCHEMATIC DESIGN :: March 11, 2024 205 E. Water Street, Suite A, Centreville, Maryland 21617 - 410.758.1000 COPYRIGHT TORCHIO ARCHITECTS, INC. 2024 "4/3 11-'33 MATERIALS ALUMINUM STOREFRONT ALUMINUM CLAD WOOD WINDOWS PVC TRIM VINYL OR CEMENT BOARD SIDING ALUMINUM RAILINGS CONCRETE FOUNDATION SINGLE-PLY MEMBRANE ROOFING (NOT VISIBLE) LC RA AH W/D HW SHELVES REF REF 02 :: 216 NORTH COMMERCE STREET MIXED USE BUILDING :: SCHEMATIC DESIGN :: March 11, 2024 205 E. Water Street, Suite A, Centreville, Maryland 21617 - 410.758.1000 COPYRIGHT TORCHIO ARCHITECTS, INC. 2024 W H LC RA AH W/D SHELVES REF W H LC AH D W CLOSET BEDROOM BEDROOM 9'-9"x 11'-6" BATH 9'-10 1/2" x 11'-10" 8' CLOSET DINING KITCHEN LIVING STAIR BALCONY 5' x 8' "0-'23 PU "8/7 6 @ R61 ND "7 @ R 02 WALK-IN CLOSET BEDROOM BEDROOM BATH 9'-9"x 11'-6" 9'-10 1/2" x 11'-10" BATH BATH DINING DW KITCHEN LIVING BALCONY 5' x 8' LEVEL 2 & 3 PLAN SCALE: 1/4"=1'-0" PU "7 @ R02 ND "7 @ R 51 60'-0" I.T. & STORAGE WALK-IN CLOSET BATH BEDROOM 10'-4"x 12'-0" LAVATORY LAUNDRY COMMERCIAL TENANT SPACE DINING KITCHEN LIVING ACCESSIBLE UNIT LEVEL 1 PLAN SCALE: 1/4"=1'-0" DATE: April 3, 2024 PROJECT: Tred Avon Partners, LLC - 216 N. Commerce Street Mixed Use Building RE: CENTREVILLE DESIGN STANDARDS COMPLIANCE CHECKLIST We believe the descriptions below are self-explanatory when you read the letter side-by-side with the Centreville Design Standards document. 4. COMMERCIAL A. PARKING 1. Parking Parking is located behind the building as required by the Centreville Design Standards (CDS). 2. Drive-thru Business: Not applicable. 3. Parking Lot Circulation The parking lot is clear and logical due to its simple layout. Planting islands and curbing are provided to delineate the majority of the parking spaces, and are supplemented with parking blocks at the head of each parking space. No parking spaces are proposed on primary vehicular travel lanes. No spaces are proposed in the vicinity of the driveway entrance/exit. No cross access easements are proposed. No future development is anticipated on adjacent parcels that warrant future connections No loading space is required or proposed for the proposed commercial unit. 4. Parking Lot Landscaping One tree is required for a lot with 8 parking space, and two are proposed. No internal planting areas are required because there are no long rows of parking spaces. 5. Parking Lot Screening No parking lot screening is required for parking lots located behind the building, according to the CDS. Moreover, we prefer that visibility from the street be maximized so incoming tra>ic can see if there is any outgoing tra>ic along the one-lane driveway. This way, incoming tra>ic can stop in the street to provide a safe opportunity for outgoing vehicles to turn right onto N Commerce Street. 6. Pedestrian Walkways through Parking Lots The ADA parking space and refuge area are as close as possible to the accessible entrance door on the side of the building. The pedestrian walkway is 5’ wide and connects the ADA parking refuge area with the turnaround area/trash corral. Tred Avon Partners – 216 N. Commerce St Design Standards Compliance Checklist April 2, 2024 Page 2 The walkways and sidewalks provide a convenient linkage from the parking lot to the main entrance on the side of the building, as well as to the front entrance for the commercial unit. The front commercial entrance is accessed directly o> the N Commerce Street sidewalk, and the entrance to the residential units is on the building side in a straightforward manner. There are no transit stops or pedestrian drop o> site associated with the proposed project. Night lighting along the south side of the building will be shown on the construction-level MEP plans as part of the architectural set. See section D below for more information. 7. Mass Transit Bus Drop O> / Pick Up Area: Not applicable. B. SIDEWALK AND PEDESTRIAN 1. Connections An attached public sidewalk is proposed, mimicking the existing sidewalk. This sidewalk will be constructed to SHA standards, according to the details included on the plans. In addition, we have shown a pedestrian connection between the rear parking lot and the adjacent County parking lot. Because County sta> have indicated that they will not allow a driveway connection between the proposed rear parking area and the County’s parking lot, we are proposing a simple pedestrian woodchip path in lieu of a formal concrete walk. This recognizes the likelihood that building users may choose to park in the adjacent lot, but it does not encourage them to do so. C. STRUCTURES 1. Prominent Entrance The main entrance is prominent in that it accessed via wide stairs to a recessed porch, with a ceiling mounted decorative light fixture and has a glass door with a large glass sidelight and transom. The porch floor will be covered with stone tiles. The side entrance is accentuated by a canopy roof with a ceiling mounted decorative light fixture and has a glass door with a large glass sidelight and transom. The light fixtures will be chosen during design development. 2. Massing The base of the building is clearly accentuated with columns, storefront windows, cornice, larger windows and enlarged base trim. The middle floors have smaller windows and balconies. The top of the building has a large cornice atop a parapet wall on the front and sides of the building. 3. Ground Level Details The street front ground floor is accentuated with columns with plinths, large storefront windows with kickplates, projecting sills, signs will be painted on windows, a front porch and cornice line separating the ground floor from the second floor. The sides not facing the Tred Avon Partners – 216 N. Commerce St Design Standards Compliance Checklist April 2, 2024 Page 3 street have taller windows than the upper floors, enlarged base trim band and a entrance canopy over the side entrance. 4. Screening Blank Walls: There are no blank walls. 5. Plazas, Courtyards, and Seating Areas The publicly-oriented common area is located to the left of the front entrance and includes two of the seven required elements: patterned stained concrete, and a public bench. A third requirement is addressed with the bicycle rack at the rear of the building, which is intended for use by the apartment residents and their guests. 6. Site Furnishings In addition to those listed in the previous paragraph, the site plan includes a grill and picnic table in the rear corner of the property. 7. Orientation to Streets The front façade of the building includes a commercial storefront and a recessed covered entrance, which are immediately identifiable as a business storefront, as suggested by the CDS. 8. Setbacks The building is set as close to the front property line as possible while still meeting the required separation between the existing powerlines and the building. (This is a safety concern for people working on the building during construction as well as maintenance over the lifetime of the building.) The CDS waives the requirement for open space for buildings such as this one that are located next to the front sidewalk. Nevertheless, we have proposed common amenities as indicated in paragraphs 5 and 6 above. 9. Weather Protection The eight foot deep recessed porch provided weather protection for the main entrance and a four foot canopy provides protection over the side entrance. 10. Roofline Expression The large cornice over the storefront windows establishes a pedestrian scale the street facade. The same large cornice likewise caps the top of the building. A sloping roof is not practice for this more urban building design. 11. Concealing Rooftop Equipment: No rooftop equipment is planned. 12. Expression of Entrances to Large Commercial Developments: Not applicable. Tred Avon Partners – 216 N. Commerce St Design Standards Compliance Checklist April 2, 2024 Page 4 D. LIGHTING 1. Height There is no pole lighting proposed. The lighting will be designed by an electrical engineer during the design development phase. The parking lot will be lit by shielded, night-sky compliant, building mounted fixtures on the rear of the building. These fixtures will be approximately 20’ above grade. The lighting will be designed not to exceed the minimum light levels established by the IESNA Recommended Practices and Design Guidelines Latest Edition and/or the American National Standards Institute (ANSI) and as necessary for safety. The site lighting will be controlled by motion sensor and photocell. 2. Illumination Illumination will comply with the requirements of the Required Standards. 3. Design Compatibility In addition to the parking lot lighting described above, there will be decorative ceiling mounted fixtures above each entrance that will be on from dusk to dawn and step lights along the southside sidewalk that will be controlled by motion sensor and photocell. 4. Discouraged Lighting: None proposed. 5. Prohibited Lighting: None proposed. 6. Exempt Lighting: So noted. E. SERVICE AREAS 1. Screening of Trash and Service Areas The trash coral will be screened by a five foot high solid vinyl fence with a 4’ wide gate. The trash and recycling containers will be the plastic tote type. MEMORANDUM TO: TOWN OF CENTREVILLE FROM: STACEY DAHLSTROM, AICP PLANNING COMMISSION SD SENIOR PLANNER, EPR FOR CENTREVILLE ORGANIZATION: CENTREVILLE MD DATE: APRIL 10, 2024 Re: Final Site Plan Review and Variance Request 216 N Commerce Street - Mixed Use Building URGENT X FOR YOUR USE PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE Introduction The Applicant seeks Final Site Plan Review (§170-22 A. (10) in accordance with the provisions of §170-47, especially §170-47 E.3 to “…approve, conditionally approve, or reject a site plan.” Additionally as part of this review, the Planning Commission is also asked to consider a variance request for a reduction of the §170-32 C.2.d requirement that driveway entrances from “... at least 7 ½ feet from side lot lines” to allow that the face of curb is 0.5 feet from the right-side lot line. In accordance with §170-59 C.1.b Planning Commission’s review is to evaluate the proposal as to consistency with the Comprehensive Plan and provide comment to the Board of Appeals. As reviewed with Planning Commission at the February 21, 2024 meeting, the Applicant has provided an updated site plan for review by Planning Commission for final site Plan Consideration and recommendation to the Board of Appeals for the variance request noted above. The development is proposed to consist of a new 33 feet, 11 ¾ inches high, three floor, 5,260 square feet mixed-use building on a currently vacant lot. The building will consist of 900 square feet of ground floor front commercial use, one, one bedroom and four two-bedroom residential apartments. The site (Map 44C, Parcel 778) is approximately 8,236 square feet (Property Land Area: SDAT) to 8,666 SF (Total Site Area noted on Site and Construction Plans) in size. 1 Final Site Plan Review Updated Information Site Plan and Schematic Design Plan The applicant has nicely identified (red revision clouds) the items on the Site Plan Sheets that have been updated in response to the discussion with staff and Planning Commission. These updates include: Sheet 1: Updated Parking Calculation space information to show the 7 parking spaces provided along with one handicap parking space onsite and the request for credit for 3 on street parking spaces for the commercial tenant space (noting that the lease document for the Commercial Space is proposed to include language that employees and customers are requested to utilize on-street parking spaces at all times). Sheet 3: Key notes and item updates include: Items 5 and 12: 9 x 9 Fenced trash corral, with fencing and concrete slab and base details as well as paint striping for handicap refuge and turn around at trash corral. Item 7: Proposed two-person bench noted fixed to 5X7-6” stained & patterned concrete to the left of the covered entry just south of the meter vault access. Water Meter Please note the applicant has indicated that “In the near future, they intend to discuss the possibility of shrinking the proposed water meter because the nearby fire hydrant flow test indicates that a 4- inch water meter will be adequate compared to the 6-inch meter currently shown. Noting they trust that a smaller meter would be preferred by the PC as to be less intrusive visually. Asking for additional clarification regarding potential reduction of the size of the “meter vault” regarding the any potential to further relocate the building forward and unfortunately, was told that any further movement of the building forward is not possible “because of the minimum setback to the overhead power lines to protect construction workers and building maintenance workers. The applicant team noted We're hoping a smaller meter box would be less obtrusive and perhaps not even visible above the sidewalk, except for the access hatch. Items 10 & 11: Proposed two-bike black steel u rack fixed to the concrete walk in the rear of the building adjacent to the 1-inch tree near the handicapped parking space and the proposed picnic table and fixed charcoal grill to be located at the rear north east “bumped” out portion of the property utilizing the area with the 1” medium tree. 2 The architectural plans have been updated to note the building height of 33 feet -11 3/4 inches on West Elevation lower left (Schematic Design – sheet 01) as well as proposed floor plan layouts (Schematic Design – Sheet 02). Design Standards Compliance Checklist The applicant kindly provided a four-page Design Standards Compliance Checklist for our review that does follow along nicely with Section 4 Commercial, Town of Centreville Commercial Design Standards. Lighting Plan – The applicant has not yet included a lighting plan for your consideration but has asked for expedited completion of one they hope to present to the Planning Commission at the April 17, 2024, meeting. Variance Request As we discussed with the applicant at the February 21, 2024 meeting it does seem a reduction of the §170-32 C.2.d requirement that driveway entrances from “... at least 7 ½ feet from side lot lines, would be consistent with the Comprehensive Plan, especially given all of the similar circumstances and characteristics in the CBD zoned area. As noted previously, the Planning Commission may wish to consider a text amendment eliminating applicability of the entrance distance criteria from the CBD zone. Consistency items: Town of Centreville: Comprehensive Plan: 2040 This designation encompasses properties downtown where mixed-use development is encouraged, and a broad array of commercial and institutional land uses would continue to be allowed. The Plan also encourages residential apartments above commercial storefronts and new residential buildings with densities that can meaningfully increase the resident population in the CBD, such as one housing unit per 1,200 square feet of lot area. Additionally granting this variance to allow the development as proposed is consistent with several of the twelve State Planning visions (Page 11, Town of Centreville Comprehensive Plan: 2040), including but not limited to: Vision - 4. Compact, mixed use, walkable design consistent with existing community character and located near available or planned transit options is encouraged to ensure efficient use of land and transportation resources and preservation and enhancement of natural systems, open spaces, recreational areas, and historical, cultural, and archeological resources. 3 Conclusion – Recommendation If review of the lighting plan anticipated to be presented during the April 17, 2004, meeting and final site plan review is satisfactory, Town Planning recommends the Planning Commission 1) Conditionally approve the final site plan and 2) recommend that the Board of Appeals approve the variance request to allow “the face of curb of the driveway entrance be 0.5 feet from the right-side lot line”, finding it consistent with the Town of Centreville Comprehensive Plan: 2040. Any recommended conditions of approval that the Commission may wish to consider, which may arise during your final site plan review should include: 1. That the Applicant shall obtain all required local, County, State, and federal approvals and permits and satisfy any final public works specifications and details that may be required by the Town engineering and public works staff. 4 Proposed Providence Farm Annexation Items for Consideration for Zoning Discussion As I briefly noted for you at the April 3 Planning Commission Work session, Town Staff (Planning, Engineering, Town Manager) and the Applicant’s representative had a positive discussion about the proposed zoning for the Proposed Providence Farm Annexation. After further discussion with our Town Attorney and the applicant, the Applicant’s team would like the opportunity to discuss that R-1 is not a zoning consistent with PFA designation or the 2040 Comp Plan along the MD Rt 304 frontage identified for nonresidential uses, as well as to discuss the zoning options. The applicant’s team hopes to get some direction from the Planning Commission before we revise the zoning request. The applicant also hopes to seek your perspective and advice regarding the zoning that might best fit what they hope to develop consistent with the Planning Commission and Town’s desired growth planning. In the Town Staff discussion, we talked about the applicant’s team considering either TND Zoning (which our Town of Centreville Comprehensive Plan: 2040 notes will be updated, page 36) or at least R-2/C-2 with the Complete Communities Place based PUD (also noted to be developed through updates to the Town’s zoning and subdivision regulations (page 38). Since both zoning and potential subdivision updates/modifications are on the Planning Commission’s Comprehensive Plan Implementation workplan, I thought this discussion might also be helpful and illustrative in that regard. During the Applicants consideration of the potential to use TND zoning (current requirements) a few example concerns have been identified which are provided as the basis for our discussion including but not limited to that the Current TND Zoning may affect the ability to do a variety of housing types, and characteristics (e.g. front loading attached garages), as well as limitations on square footage of nonresidential uses. Overview of issues Land Use/Zoning and Priority Funding Issues The following is a series of supporting items noted from the Town of Centerville Comprehensive Plan: 2040 as well as Maryland Legislation that provides more information about discussions Town Staff has had with the applicant regarding the recommendation that they seek alternative zoning than R-1 for the proposed Annexation. Future Land Use Of the Total approximately 279.6690 Acres proposed for annexation, Centreville’s Future Land Use Plan provides: Resource Conservation/Open Space: 101 acres Commercial: 23 acres Residential: 156 acres 1 2 Zoning Original Zoning proposed by the Applicant is noted in the proposed Annexation Plan (Resolution Exhibit C) as R-1 and that the Complete Neighborhood PUD “floating zone” (or another district consistent with the Comprehensive Plan and the provisions of the PUD zone will “control the development and the use of the property. Clip from the proposed Annexation agreement: The Annexation agreement correctly identifies that the parcel is designated as Complete Neighborhood on Map 2 Growth Area Plan in the Municipal Growth Element (page 27 as well as in the Annex) and as identified as a Tier II Growth Area (Map 1 B, page 26 and the Annex) in the Town of Centreville Comprehensive Plan: 2040. Tier II designations are future growth areas planned for sewer service. In Town Staff Manager, Engineer and Planner’s discussion we’ve talked about how the proposed R-1 Zoning isn’t consistent with Future Land Uses noted on the Future Land Use map (clip provided above), especially the Resource Conservation/Open Space (approximately 100 acres and Commercial (approximately 23 acres). Consistency considerations for the Residential, Resource Conservation/Open Space and Commercial Future Land Uses: Residential – Complete Neighborhoods Density and MD Public Facilities Financing Statute As noted on page 35 in the Residential section of the Future Land Use Element (Town of Centreville Comprehensive Plan: 2040) that infill tracts be developed as “..complete neighborhoods based on designs consistent with the Complete Neighborhoods Objectives and the Town’s complete neighborhood priorities- with an overall density approximating 3.5 housing units per acre”. 3 Additionally, as provided in Table 2 (page 18 as well as in the Annex), Growth Area 4 in which the proposed annexation parcel is located is identified as Residential Zoning, for the larger area (including the parcel proposed for annexation) based on a density of 3.5 units per acre noted as the minimum density to be achieved in support of financial feasibility for the provision of sewer and priority funding area (PFA) requirements. State of Maryland statues related to Priority Funding Area (PFA designation requirements) State Finance and Procurement Article 5 “ §5–7B–03. (d) (3) (i) If an existing community receives a public or community sewer system, an area beyond the periphery of the developed portion of the existing community may be designated as a priority funding area if the development of the area beyond the periphery: 1. has a permitted average density of at least 3.5 units per acre; and 2. the area is served by a public or community sewer system.” (e) An area, other than an existing community under subsection (d) of this section, may be designated as a priority funding area if: (1) the area: (i) is within a locally designated growth area of the local government; and 4 (ii) is planned to be served under the approved 10-year water and sewer plan; (2) the designation represents a long-term development policy for promoting an orderly expansion of growth and an efficient use of land and public services; and (3) in that part of the area designated by the local government for residential use or development, there is permitted an average density of not less than 3.5 units per acre. Even in 2001, when the Rolling Bridge Subdivision was proposed for development in Queen Annes County, and the Town of Centreville raised objections regarding the lost opportunity for growth, that calculation was based on 4 dwelling unites per acre (consistent with PFA requirements of 3.5 du per acre for State may not provide funding for a growth-related project if the project is not located within a priority funding area. 5 Waiver Request – Ordinance 02-2024 The following explanation about waiver provision provided in State statues is an excerpt from the Maryland Municipal League’s Annexation Handbook: “Subsection 4-416(b) of the Local Governments Article of the Annotated Code provides that no city or town may for five years following an annexation allow development of property within an annexed area if the development would be substantially different than the use authorized under county zoning at the time of the annexation. Also, for five years following an annexation, development density of newly annexed property may not be greater than 50% higher than would have been permitted under county zoning at the time of annexation. A county governing body may waive this requirement if its members desire.” The applicant has indicated they would like the Town to apply for a waiver from Queen Anne’s County for consideration of the ability to provide R-1 Zoning for the Parcel from the County’s current Zoning of A to be considered. Ordinance,-02-2024-Rezoning-Map-44F-Parcel-60-Providence at Centreville introduced by Centreville Town Council March 22, 2024 and referred to the Planning Commission for comment. R-1 Density and Consistency For you reference re R-1 Zoning Please see the following clip from the Schedule of Zone Regulations: As you are likely aware and may recall, Centreville’s R-1 Zoning only allows a maximum of 3.0 dwelling units per acres, except for Active Adult single Family. While Active Adult Single family could be an important component of a complete neighborhood, one that is 100% Active Adult single family isn’t consistent with the development of complete neighborhoods (page 38). 6 Commercial Land Use As noted above, the Future Land Use map depicts approximately 23 acres of Commercial Land Use for this parcel which is also depicted on Map 8 street Plan (page72 and the Annex) to include new primary local streets as well as a minor collector extending Vincit street southward to the East Side Major Collector at Taylor Mill Road Extended to serve the north-south travel needs of the southeast portion of the growth area. The applicant has indicated in a meeting with the County that they will propose to offer approximately 10 acres of the property (assumed to be adjacent to parcels currently owned by Queen Annes County) which appear to be located in the area currently depicted as Commercial on the Future Land Use map. The County may consider this as an opportunity for further consolidation of County Offices and would then need to work with the Town for the appropriate Zoning as Government offices are not a permitted use in R-1. Additionally, this would result in approximately 13 acres that would also need to be rezoned to be able to implement and develop “supporting non – residential uses” of a commercial land use nature. Additionally, this item included in the proposed Annexation Agreement and Public Facilities Agreement is also confusing regarding the Commercial use reference, especially given the request for R-1 zoning: Town Staff has discussed the issues we find with R-1 zoning included in the Annexation Plan, Annexation Agreement as well as Ordinance 02-2024 not being consistent with the Town of Centreville Comprehensive Plan: 2040 as well as jeopardizing the areas eligibility for Priority Funding Area (PFA) Certification (state assisted financing for public facilities). Town staff recommends that the applicant reconsider zoning to something that provides non residential uses to be established in the areas identified as Commercial Land Use that support the residential ( mix of housing types and overall residential density of 3.5 units an acre for the residential portions of the property as noted above). 8 Resource Conservation Open Space This parcel is one noted to have deed restricted open space (depicted on Map 1 A, page 24 and in the annex). The applicant has indicated that approximately 155.96 acres was required to be Deed Restricted Open Space as a part of the Rolling Bridge Subdivision and is currently restricted to only being further developed in the event that Annexation by Centreville occurs, or is attempted and rejected, then the applicant has the right to address with further consideration from Queen Annes County. These excerpts/snips from QAC Planning Department memo to Queen Annes County Planning staff memo to Commission July 12, 2001, QAC File #03-01-04-0004, Peter G. Sheaffer (Providence Farm): 9 These excerpts from 8/22/2001 Deed of Open Space Easement (date stamped clerk of circuit Court- October 16 2001: Just as an illustration of some of the Watershed issues that we need to be aware of re the proposed Annexation, please see this snip from the Tier II Watershed map (MDE), the yellow shading you see on the eastern side of the property represents areas with no assimilative capacity. 10 Approximately 113 acres (of the approximately 156 acres of residential depicted on the Future Land Use map) remain if this No Assimilative Capacity area is removed (assuming it needs to be water quality enhanced rather than available for development). The applicant has indicated that they will be seeking a release from that Open Space Deed Restriction to be effective upon subdivision approval. 11 M. 44C HERITAGE CBD P. 844 TOWN OF CENTREVILL R- E 1 D M. 44C 5 4 M. 44C M. 44C Proposed Zoning Map Changes P. 895 M. 44C M. 44C T P. 833 P. 750 304 P L . o 9 t 0 1 6 3 2 P. 93 E R 6 T Y S B M R . O 4 A 4C D W A Y M P. . 7 4 7 4 5 C M P. . 7 4 4 4 7 C Centreville Zoning R-2 P M . . 1 4 0 4 2 C 0 P M . . 1 4 0 B 4 2 E C 1 R T Y 1 S M T W . N 4 4 W L I C B A T L E A R W S Y T R E P R . S 9 3 R N 5 O C O W M M E R C E S T M P. . M P 7 4 . 5 . 4 7 4 4 C 7 4 3 C N J O L N CB M P D M . P . . 4 7 . 4 4 7 4 C 6 4 4 7 C Lot 2 M P. C C P C R . 7 R 4 - - B - 4 2 3 1 4 A D 8 C - - - ( C - G I R n C - e e 1 t s n e e ) i n e n d - R r t s e P r a e n- a l l 3t a C l C i n a B o o n l m u m e s m d m in e R e e r r e s c c s d i i a e a D l v l i e s l t o r p ic m t ent Area I P. 1132 M. 44C A S L P. 933 B M P. . 7 4 4 4 4 C M P. . 7 4 4 4 5 C R-2 - Residential M. 44C Lot 3 R-3 - Residential T P. 706 M. 44C M. 44C S M. 44C P. 743 P M . . 1 P 4 0 . 4 2 1 C 9 027 FA Y ETTE P M . S . 1 T 4 1 4 2 C 1 S C O M M E R C E CB M P M D . P . . . 7 4 4 7 0 4 4 0 4 C C 5 P. 708 M P. . 7 4 2 4 E 4 C W M P. A . 7 T 4 2 E 4 5 C R A ST M P. . 7 4 4 4 1 C M P. 1 . 0 7 4 4 4 0 C 11 M P. . 5 4 1 4 2 C RR ROW P M . . 1 4 1 4 4 C 1 M P. . 7 4 0 4 3 C 7 12 13 17 14 M. 44C M. 44C C N P. 511 H U P. 702 L E IDP M . . Z1 4 1o 4 4n C 2e Fr R o C m H LZNone To Area(ac.) R-2 A D Y 9 A A V M P. . 5 4 1 4 4 C M. 1 5 44C M. 44C M P. . 5 4 0 4 7 C 1 2 3 4P M . . 1 R R R R 4 1 4 - - - -1 2 2 2 2 C 1 213 C C C C B B B B D D D D M P. . 6 4 9 4 9 C 0 0 0 0 M . . . . P 0 0 6 1 . . 4 3 6 5 7 4 0 4 1 C H A P P Y L 8 E N N S Y L V M A P N . . I 7 4 3 4 C 6 0 C -3 M P. . 7 4 R 3 4 9 - C 2 A N A V E M P . . 4 5 M P 4 1 . . C 5 5 4 1 4 5 C F P. 509 P. 1 5 6 08 C-3 18 M P. . 5 4 0 4 1 C M. 44C P M 5 R-2 PC. B6D34 0.17 G H M P. . 5 4 1 4 7 C M. 44C R 6 C-3 M. 44C CBD 2.08 T I L M. 44C P. 501 T D M P. . 7 8 9 6 4 3 4 0 C C P P R R -3 A A M P ( ( . . C C 4 6 - - 4 3 1 1 P. C 2 ) ) 6 R 33 - C C C 2 B B B D D D M P. . 6 4 3 4 5 C 0. 0 0 6 . . 4 3 5 T S M P. . 6 4 4 4 1 C M P . . 4 5 4 4 C 3 M P. . 5 4 4 4 6 M P C . . 5 4 3 4 9 C P L . o t 5 2 1 3 R A T IL R O A D 19 21 20 LI T T L E H U M P L . . o 5 t 4 0 4 1 1 C 10 C-3 CBD 0.94 A S V M. 44C 11 C-3M. 44C CMB.D 44C 0.32 N E M. 44C M. 44C M. 44C E P. 501 P. 631 P. 694 M. 44C O P. 565 P. 549 P. 529 Lot PR C 12 C-3 CBD P. 693 0.83 J T T 1 1 3 4 C C - - 3 3 C C B B D D M P . . 4 6 4 9 C 6 0 0 . . 4 4 2 3 S T E R C O W N S M P. . 5 4 6 4 8 C M P. . 5 4 6 4 0 C KIDW ELL AVE R- M 2 . 44C PRICE ST 304 M. 44C 15 C-3 CBD 1.79 E R P. 554 P. 501 H B M. 44C M. 44C M. 44C C-3 16 C-3 CBD 1.46 C P. 557 M. 44C P. 564 P. 559 17 R-3 CBD 3.71 P. 570 22 PROVIDENCE M. 44C M. 44C FARM P. 558 P. 505 M P. M . P 6 4 . . 1 1 1 2 2 2 4 2 4 6 8 9 0 1 2 C 4 1 C 1 C C C C R M P. - - - - - . 3 3 3 3 2 5 4 8 4 8 C S P R I N G S T C C R C R M P B B - B -. 3 3 . D D D 5 4 8 4 7 C 13 0 1 1 4 . . . . . 4 1 0 5 4 6 5 6 5 9 M R P. . - 5 4 2 7 4 9 C M P. . 6 4 7 4 8 M P C L . L . o 5 I t 4 T 7 4 1 6 T F LE KIDW ELL AVE R-2 PROVIDENCE CT G R E E N S T R-2 Lo M t . P 1 . 4 9 6 4 A 0 F C-2 ISSUED BUILDING PERMITS March 1 - 31, 2024 Permit # Applicant Owner Address Type Issue Date* BP-17-24 James Wurster James Wurster 112 Walnut St. Fence 3/4/2024 BP-20-24 Bradley Hull Mark Selby 109 Chestnut addition, close in porch 3/7/2024 BP-21-24 Richard Keith/Processor 5253 LLC 2977 4H Park Rd. tenant fit-out 3/7/2024 BP-22-24 Wells Home Improvements Roberta King 118 Encore Court replace roof 3/7/2024 BP-23-24 Economy Restoration Leslie Follum 105 Northfield Way replace roof 3/11/2024 BP-24-24 Island Remodeling LLC Samuel Diphilippo 202 Tilghman Ave Kitchen and bath remodel 3/21/2024 BP-25-24 Economy Restoration Brian Russell 426 Brookfield Dr. replace roof 3/21/2024 BP-26-24 Christopher Evans Christopher Evans 206 S. Liberty St. garage on concrete pad 3/21/2024 BP-27-24 Darrell Barricklow QAC Commissioners 110 Vincit St temporary site trailer/Commercial 3/21/2024 BP-28-24 Bozek, Inc. Penn Station Joint Venture 210 Pennsylvania Ave. modification/commercial 3/21/2024 * based on the approval date by Zoning Administrator