impact of projected growth water and sewer capacity 2040

Document July 20, 2022 · 1 page(s)

Read as text View original PDF ↗ Meeting

Draft table estimating 2040 water and sewer demand under three growth projections and the wastewater treatment plant (WWTP) capacity needed for each: at least 1.18 million gpd for Projection 1, 1.66 million gpd for Projection 2, and 1.25 million gpd for Projection 3. The figures note they include actual flows plus commitments to provide service equivalent to 26,000 gpd.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

DRAFT
Impact of Projected Growth: Water and Sewer Capacity
2040 Projection 1 2040 Projection 2 2040 Projection 3
Community Facility Non- Non- Non-
Existing % Use in
Capacity Demand1 2022 Residential Residential Capacity % Use in Residential Increased Capacity % Use in Residential Increased Capacity % Use in
Increased Increased Remaining Increased Remaining Increased Demand Remaining
2040 Demand (gpd) 2040 2040
Demand Demand (gpd) (gpd) Demand (gpd) Demand (gpd) (gpd)
(gpd) (gpd) (gpd)
Public Water (gallons per day)
Public Sewer (gallons per day)2 5 42,000 5 03,000 93% 2 5,000 1 11,000 ( 183,000) 118% 2 5,000 5 93,500 ( 579,500) 207% 2 5,000 178,500 ( 164,500) 130%
A WWTP with a capacity of at least 1.18 million gpd would be A WWTP with a capacity of at least 1.66 million gpd would be A WWTP with a capacity of at least 1.25 million gpd
Implications
required. required. would be required.
1Includes actual flow plus commitments to provided service equivalent to 26,000 gpd.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.